Naval Today
  • Vessels
  • Equipment & Technology
  • Operations
  • Capital Investments
  • Authorities
  • More news
JobsNewsletter
Naval Today logo

Your trusted source for naval and maritime news, part of the Navingo network.

Topics
  • Equipment & technology
  • Industry
  • Vessels
  • Operations
  • Training & Education
Network
  • NavalToday
  • Dredging Today
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Surface Vessels›INS Teg Successfully Finishes Sea Trials
Surface Vessels

December 28, 2011 · about 15 years ago

INS Teg Successfully Finishes Sea Trials

Sea trials of frigate INS Teg have been successfully finished in the Baltic Sea; the ship was built for Indian Navy by Yantar Shipyard (Kaliningrad, Russia), reports ITAR-TASS. According to the shipyard’s press secretary Sergei Mikhailov, all shipboard systems including BrahMos missile system operat

2 minutes read
  • LinkedIn
  • X
  • Email

Sea trials of frigate INS Teg have been successfully finished in the Baltic Sea; the ship was built for Indian Navy by Yantar Shipyard (Kaliningrad, Russia), reports ITAR-TASS .

According to the shipyard’s press secretary Sergei Mikhailov , all shipboard systems including BrahMos missile system operate normally. To complete state trials, frigate INS Teg has to perform only one sortie scheduled in Jan 2012.

Indian crew will start training onboard the ship late in Jan 2012. The frigate is to be handed over to Indian Navy in Apr 2012.

INS Teg was laid down at Yantar in 2007 and became the first of three Project 1135.6 ships built for Indian Navy. Other two frigates – INS Tarkash and INS Trikand – are being currently completed. They are planned to join Indian Navy in 2012 and 2013 respectively. The contract signed in 2007 in New Delhi cost $1.6 bln.

According to ITAR-TASS , new Project 1135.6 frigates have almost same technical characteristics as three ships of the same project – INS Tabar , INS Trishul , and INS Talwar – delivered to India under the contract of 1997. Mostly, differences are about armament. For instance, new frigates are equipped with BrahMos supersonic cruise missiles in contrast to the preceding trio armed with antiship missiles Club-N .

Displacement of Project 1135.6 frigates is 4,000 tons; length is 124.8 meters; max speed is 30 knots; operating range is 4,500 miles.

[mappress] Naval Today Staff , December 28, 2011; Image: bharat-rakshak

Reach the Naval Today industry in one go!

Naval Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Naval Today on:

Filed under

Surface VesselsVesselsEquipment & technologyWeapons Systems

Daily Naval, Defence and Maritime News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Spanish Navy's second F110 frigate hits the water
  2. 2Hanwha Defense USA acquires controlling stake in Philly Shipyard
  3. 3US Navy awards CACI $145M contract to advance maritime tech
  4. 4Fairbanks Morse wins $99M deal for US Navy submarine overhauls

Daily Naval, Defence and Maritime News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free