Naval Today
  • Vessels
  • Equipment & Technology
  • Operations
  • Capital Investments
  • Authorities
  • More news
JobsNewsletter
Naval Today logo

Your trusted source for naval and maritime news, part of the Navingo network.

Topics
  • Equipment & technology
  • Industry
  • Vessels
  • Operations
  • Training & Education
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Surface Vessels›USA: HII to Purchase Long-Lead Materials for Sixth NSC
Surface Vessels

April 1, 2012 · about 14 years ago

USA: HII to Purchase Long-Lead Materials for Sixth NSC

Huntington Ingalls Industries announced on Friday, March 30th, that its Ingalls Shipbuilding division has received a $76 million fixed-price contract from the U.S. Coast Guard to purchase long-lead materials for a sixth National Security Cutter (NSC). Construction and delivery of the yet-to-be-named

3 minutes read
  • LinkedIn
  • X
  • Email

Huntington Ingalls Industries announced on Friday, March 30th, that its Ingalls Shipbuilding division has received a $76 million fixed-price contract from the U.S. Coast Guard to purchase long-lead materials for a sixth National Security Cutter (NSC). Construction and delivery of the yet-to-be-named WMSL 755 will be performed at the company’s Pascagoula facility. A second phase of the contract, when awarded, would bring the overall value to $88 million.

“This award demonstrates the Coast Guard’s ongoing commitment to the National Security Cutter program and continued confidence in our shipbuilders,” said Mike Duthu , Ingalls’ program manager, Coast Guard programs. “This procurement contract enables us to focus on effective and efficient supply chain management so we can secure the best price for equipment and materials, while also meeting our schedule commitments with our U.S. Coast Guard customer.”

The advance procurement funds will be used to purchase major items for WMSL 755, including steel, the main propulsion systems, generators, electrical switchboards and major castings.

Ingalls has delivered the first three NSCs, the flagship of the Coast Guard’s cutter fleet, designed to replace the 378‐foot Hamilton -class high-endurance cutters, which entered service during the 1960s. The first two ships are performing missions for the Coast Guard, while the third ship, Stratton (WMSL 752), will be commissioned on March 31 in Alameda, Calif. The fourth NSC, also named Hamilton (WMSL 753), is currently under construction, and the fifth, Joshua James (WMSL 754), will start fabrication later this year.

Ingalls builds the NSC hulls and mechanical and electrical systems, while Lockheed Martin builds and integrates the command, control, communications, computers, intelligence, surveillance and reconnaissance (C4ISR) capabilities.

NSCs are 418 feet long with a 54-foot beam and displace 4,500 tons with a full load. They have a top speed of 28 knots, a range of 12,000 miles, an endurance of 60 days and a crew of 110.

The Legend -class NSC is capable of meeting all maritime security mission needs required of the high-endurance cutter. The cutter includes an aft launch and recovery area for two rigid hull inflatable boats and a flight deck to accommodate a range of manned and unmanned rotary-wing aircraft. It is the largest and most technologically advanced class of cutter in the U.S. Coast Guard, with robust capabilities for maritime homeland security, law enforcement, marine safety, environmental protection and national defense missions. This class of cutters plays an important role in enhancing the Coast Guard’s operational readiness, capacity and effectiveness at a time when the demand for their services has never been greater.

Huntington Ingalls Industries (HII) designs, builds and maintains nuclear and non-nuclear ships for the U.S. Navy and Coast Guard and provides after-market services for military ships around the globe. For more than a century, HII has built more ships in more ship classes than any other U.S. naval shipbuilder. Employing nearly 38,000 in Virginia, Mississippi, Louisiana and California, its primary business divisions are Newport News Shipbuilding and Ingalls Shipbuilding.

[mappress] Naval Today Staff , April 02, 2012; Image: HII

Reach the Naval Today industry in one go!

Naval Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Naval Today on:

Filed under

Surface VesselsVesselsEquipment & technologyPropulsion

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Damen to refit four Royal Bahamas Defence Force vessels
  2. 2OPTICS11 lands Dutch MoD contract for containerized towed array system
  3. 3TKMS and Navantia join hands on submarine projects
  4. 4Fincantieri cuts steel for Italian Navy’s second FREMM EVO frigate

Related articles

US Navy awards contract for mid-range maritime strike missile
Equipment & technology

US Navy awards contract for mid-range maritime strike missile

4 days ago

Babcock and LIG D&A team up on AH-140 frigate, missiles and unmanned systems
Industry

Babcock and LIG D&A team up on AH-140 frigate, missiles and unmanned systems

4 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

US Navy awards contract for mid-range maritime strike missile
Equipment & technology

US Navy awards contract for mid-range maritime strike missile

4 days ago
Babcock and LIG D&A team up on AH-140 frigate, missiles and unmanned systems
Industry

Babcock and LIG D&A team up on AH-140 frigate, missiles and unmanned systems

4 days ago