Naval Today
  • Vessels
  • Equipment & Technology
  • Operations
  • Capital Investments
  • Authorities
  • More news
JobsNewsletter
Naval Today logo

Your trusted source for naval and maritime news, part of the Navingo network.

Topics
  • Equipment & technology
  • Industry
  • Vessels
  • Operations
  • Training & Education
Network
  • NavalToday
  • Dredging Today
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Surface Vessels›USA: Newport News Shipbuilding to Lift and Place Island on CVN78
Surface Vessels

January 21, 2013 · about 13 years ago

USA: Newport News Shipbuilding to Lift and Place Island on CVN78

Newport News Shipbuilding (NNS) will on Saturday, Jan. 26th, lift and place the 555-metric ton island onto the flight deck of Gerald R. Ford (CVN 78), the first of the next-generation class of nuclear-powered aircraft carriers. The ship’s sponsor and President and Mrs. Gerald R. Ford’s daughter, Sus

1 minutes read
  • LinkedIn
  • X
  • Email

Newport News Shipbuilding (NNS) will on Saturday, Jan. 26th, lift and place the 555-metric ton island onto the flight deck of Gerald R. Ford (CVN 78), the first of the next-generation class of nuclear-powered aircraft carriers. The ship’s sponsor and President and Mrs. Gerald R. Ford’s daughter, Susan Ford Bales, will participate in the event.

The Gerald R. Ford-class represents the next-generation class of aircraft carriers, and features an enhanced flight deck, improved weapons movement, a redesigned island, a new nuclear power plant, electromagnetic catapults, reduced manning and growth margin for future technologies. The carrier’s christening is scheduled for 2013, followed by delivery to the U.S. Navy in 2015. Long lead material procurement for the second ship of the class, John F. Kennedy (CVN 79), began in 2009 and the first steel for its construction was cut in February 2011.

Gerald R. Ford is being built using modular construction, a process where smaller sections of the ship are welded together to form large structural units, outfitting is installed, and the large units are lifted into the dry dock.

[mappress] Naval Today Staff, January 21, 2013; Image: NNS

Reach the Naval Today industry in one go!

Naval Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Naval Today on:

Filed under

Surface VesselsVessels

Daily Naval, Defence and Maritime News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Steel cut for Swedish Navy's first FDI frigate
  2. 2US Navy decommissions two Ticonderoga-class cruisers
  3. 3USS Germantown ends more than 40 years of naval service
  4. 4Keel laid for Italian Navy's second U212NFS submarine

Daily Naval, Defence and Maritime News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free