Naval Today
  • Vessels
  • Equipment & Technology
  • Operations
  • Capital Investments
  • Authorities
  • More news
JobsNewsletter
Naval Today logo

Your trusted source for naval and maritime news, part of the Navingo network.

Topics
  • Equipment & technology
  • Industry
  • Vessels
  • Operations
  • Training & Education
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Surface Vessels›VIDEO: HII Completes Flight Deck on Aircraft Carrier USS Gerald R. Ford
Surface Vessels

April 15, 2013 · about 13 years ago

VIDEO: HII Completes Flight Deck on Aircraft Carrier USS Gerald R. Ford

Huntington Ingalls Industries announced yesterday, April 15 that the flight deck of the nuclear-powered aircraft carrier Gerald R. Ford is complete following the addition of the ship’s upper bow section on April 9 at Newport News Shipbuilding (NNS). The upper bow extends the overall length of the ca

2 minutes read
  • LinkedIn
  • X
  • Email

Huntington Ingalls Industries announced yesterday, April 15 that the flight deck of the nuclear-powered aircraft carrier Gerald R. Ford is complete following the addition of the ship’s upper bow section on April 9 at Newport News Shipbuilding (NNS). The upper bow extends the overall length of the carrier to its full size, which is 1,106 feet—equal to a 75-story building lying on its side.

Weighing 787 metric tons and comprising 19 steel sections, the addition of the upper bow brings Ford to 96 percent structural completion. The carrier construction team began construction on the upper bow unit in December 2011. Ford has been under construction since November 2009.

”Placement of the upper bow gives our entire shipbuilding team a great sense of accomplishment,” said Rolf Bartschi, NNS’ vice president, CVN 78 carrier construction . “We have now structurally erected the flight deck to its full length.”

Gerald R. Ford is being built using modular construction, a process where smaller sections of the ship are welded together to form large structural units, equipment is installed, and the large units are lifted into the dry dock. The upper bow unit is the 475th unit erected out of 496 used to build the carrier. It also is the 160th superlift to erect out of the 162 scheduled. It joins the lower bow section that was set into place on May 24, 2012, in the dry dock. The lifts are accomplished using the shipyard’s 1,050-metric ton gantry crane, one of the largest in the Western Hemisphere.

Gerald R. Ford represents the next-generation class of aircraft carriers. The first-in-class ship features a new nuclear power plant, a redesigned island, electromagnetic catapults, improved weapons movement, an enhanced flight deck capable of increased aircraft sortie rates, growth margin for future technologies and $4 billion reduced total ownership cost compared to a Nimitz-class aircraft carrier. The ship is scheduled to launch later this year.

[mappress] Naval Today Staff, April 16, 2013; Image: HII

Reach the Naval Today industry in one go!

Naval Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Naval Today on:

Filed under

Surface VesselsVessels

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Canada and UK firms join forces to expand autonomous vessel operations in North America
  2. 2Australia invests another $4.6 billion in AUKUS submarine construction yard
  3. 3US Navy's final expeditionary sea base wraps up acceptance trials
  4. 4HII expands distributed shipbuilding model to US Navy amphibious ships

Related articles

Fincantieri cuts steel for Italian Navy’s second FREMM EVO frigate
Surface Vessels

Fincantieri cuts steel for Italian Navy’s second FREMM EVO frigate

5 days ago

Babcock and LIG D&A team up on AH-140 frigate, missiles and unmanned systems
Industry

Babcock and LIG D&A team up on AH-140 frigate, missiles and unmanned systems

5 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Fincantieri cuts steel for Italian Navy’s second FREMM EVO frigate
Surface Vessels

Fincantieri cuts steel for Italian Navy’s second FREMM EVO frigate

5 days ago
Babcock and LIG D&A team up on AH-140 frigate, missiles and unmanned systems
Industry

Babcock and LIG D&A team up on AH-140 frigate, missiles and unmanned systems

5 days ago