Naval Today
  • Vessels
  • Equipment & Technology
  • Operations
  • Capital Investments
  • Authorities
  • More news
JobsNewsletter
Naval Today logo

Your trusted source for naval and maritime news, part of the Navingo network.

Topics
  • Equipment & technology
  • Industry
  • Vessels
  • Operations
  • Training & Education
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Surface Vessels›USA: NNS Installs Final Aircraft Elevator on Gerald R. Ford
Surface Vessels

August 15, 2013 · about 13 years ago

USA: NNS Installs Final Aircraft Elevator on Gerald R. Ford

Huntington Ingalls Industries announced on August 14 that its Newport News Shipbuilding (NNS) division installed the third and final aircraft elevator on the nuclear-powered aircraft carrier Gerald R. Ford (CVN 78). The elevator, which is used to move aircraft from the hangar bay to the flight deck

1 minutes read
  • LinkedIn
  • X
  • Email

Huntington Ingalls Industries announced on August 14 that its Newport News Shipbuilding (NNS) division installed the third and final aircraft elevator on the nuclear-powered aircraft carrier Gerald R. Ford (CVN 78).

The elevator, which is used to move aircraft from the hangar bay to the flight deck quickly and safely, is located on the starboard side of the ship. It measures 85 feet long and 52 feet wide and weighs 120 tons, akin to a steam locomotive.

“The Ford class is designed with three aircraft elevators, one less than the Nimitz class,” said Rolf Bartschi, NNS vice president, CVN 78 carrier construction. “The design provides greater flight deck area for increased sortie rates over the Nimitz-class design. The location and number of aircraft elevators are an integral part of the design.”

Gerald R. Ford’s primary hull structure reached 100 percent structural completion in May, bringing more than three years of structural erection work to a close. Work continues on the ship, including work on the piping and electrical systems and habitability areas such as the galley and mess spaces. Shipbuilders are also in the process of painting the hull prior to the ship’s christening, scheduled for Nov. 9.

[mappress] Press Release, August 16, 2013; Image: HII

Reach the Naval Today industry in one go!

Naval Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Naval Today on:

Filed under

Surface VesselsVessels

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Canada and UK firms join forces to expand autonomous vessel operations in North America
  2. 2Australia invests another $4.6 billion in AUKUS submarine construction yard
  3. 3US Navy's final expeditionary sea base wraps up acceptance trials
  4. 4HII expands distributed shipbuilding model to US Navy amphibious ships

Related articles

Damen
Surface Vessels

Damen to refit four Royal Bahamas Defence Force vessels

23 hours ago

Fincantieri cuts steel for Italian Navy’s second FREMM EVO frigate
Surface Vessels

Fincantieri cuts steel for Italian Navy’s second FREMM EVO frigate

5 days ago

Babcock and LIG D&A team up on AH-140 frigate, missiles and unmanned systems
Industry

Babcock and LIG D&A team up on AH-140 frigate, missiles and unmanned systems

5 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Damen
Surface Vessels

Damen to refit four Royal Bahamas Defence Force vessels

23 hours ago
Fincantieri cuts steel for Italian Navy’s second FREMM EVO frigate
Surface Vessels

Fincantieri cuts steel for Italian Navy’s second FREMM EVO frigate

5 days ago
Babcock and LIG D&A team up on AH-140 frigate, missiles and unmanned systems
Industry

Babcock and LIG D&A team up on AH-140 frigate, missiles and unmanned systems

5 days ago