Naval Today
  • Vessels
  • Equipment & Technology
  • Operations
  • Capital Investments
  • Authorities
  • More news
JobsNewsletter
Naval Today logo

Your trusted source for naval and maritime news, part of the Navingo network.

Topics
  • Equipment & technology
  • Industry
  • Vessels
  • Operations
  • Training & Education
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Amphibious & Support Ships›USS Zephyr Structural Overhaul Commences
Amphibious & Support Ships

August 12, 2014 · about 12 years ago

USS Zephyr Structural Overhaul Commences

Norfolk Ship Support Activity (NSSA) oversaw the dry-docking of USS Zephyr (PC 8) at Colonna’s Shipyard as it prepares to undergo a complete structural overhaul, Aug. 8. Prior to Zephyr’s transfer to Norfolk she was serving as a coastal defense duties training vessel for Sailors stationed in Maypo

1 minutes read
  • LinkedIn
  • X
  • Email

Norfolk Ship Support Activity (NSSA) oversaw the dry-docking of USS Zephyr (PC 8) at Colonna’s Shipyard as it prepares to undergo a complete structural overhaul, Aug. 8.

Prior to Zephyr’s transfer to Norfolk she was serving as a coastal defense duties training vessel for Sailors stationed in Mayport, Florida.

“Docking ships at Colonna’s is different from normal dry-docking procedures since they utilize the world’s largest travel lift,” said NSSA naval architect technician Kevin Baum “In the water, ships are positioned onto a cradle which is fitted with a built in blocking system. That cradle is rigged with steel wire cables capable of lifting the ship out of the water and driving it onto land where it can be staged for its repairs.”

Once on land the ship can be shrink wrapped to protect it from the elements as repairs are being made.

With the significant amount of structural members being replaced a structural process control procedure is developed to protect the ship for incurring additional damage.

Earlier this year, NSSA provided the same oversight for USS Shamal (PC 13) during a nine-month structural overhaul.

Reach the Naval Today industry in one go!

Naval Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Naval Today on:

Filed under

Amphibious & Support ShipsVessels

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Steel cut for Indonesia’s first Scorpène submarine
  2. 2US Coast Guard explores laser weapons against drones and USVs
  3. 3HII to award up to $900M in shipbuilding work to robotics firms
  4. 4US Navy trials Lockheed Martin's AI-powered sub hunter

Related articles

Trump class battleship
Vessels

CBO: US Navy’s Trump-class battleship program could cost $275B

1 day ago

ocean mapping
Vessels

Blue Water Autonomy wins spot on US Navy’s $40M ocean mapping contract

2 days ago

Pohjanmaa class corvette
Surface Vessels

Keel laid for Finnish Navy's fourth Pohjanmaa-class corvette

2 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Trump class battleship
Vessels

CBO: US Navy’s Trump-class battleship program could cost $275B

1 day ago
ocean mapping
Vessels

Blue Water Autonomy wins spot on US Navy’s $40M ocean mapping contract

2 days ago
Pohjanmaa class corvette
Surface Vessels

Keel laid for Finnish Navy's fourth Pohjanmaa-class corvette

2 days ago