Naval Today
  • Vessels
  • Equipment & Technology
  • Operations
  • Capital Investments
  • Authorities
  • More news
JobsNewsletter
Naval Today logo

Your trusted source for naval and maritime news, part of the Navingo network.

Topics
  • Equipment & technology
  • Industry
  • Vessels
  • Operations
  • Training & Education
Network
  • NavalToday
  • Dredging Today
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Contracts›HMS Queen Elizabeth Leaves Babcock Dock in Rosyth, UK
Contracts

October 7, 2014 · about 12 years ago

HMS Queen Elizabeth Leaves Babcock Dock in Rosyth, UK

HMS Queen Elizabeth was floated out of the Babcock dock in Rosyth (UK). Designed and built by BAE Systems and assembled by Babcock Marine, the HMS Queen Elizabeth is the biggest, and most powerful, surface warship ever to join the Royal Navy and capable of carrying up to forty aircraft. The aircraft

2 minutes read
  • LinkedIn
  • X
  • Email

HMS Queen Elizabeth was floated out of the Babcock dock in Rosyth (UK). Designed and built by BAE Systems and assembled by Babcock Marine, the HMS Queen Elizabeth is the biggest, and most powerful, surface warship ever to join the Royal Navy and capable of carrying up to forty aircraft.

The aircraft carrier, the first of the Queen Elizabeth-class, was officially named by the Queen.

BAE Systems selected FORAN as its design tool in 2006 and, therefore, SENER’s software has been the CAD/CAM/CAE system for this important project. The first challenge was to develop an early 3D model of the hull structure for the Queen Elizabeth Class (QEC) during the Stage 1 of the design. Based on the success of this phase, BAE Submarines (Barrow), BAE Naval Ships (Glasgow) and later on Babcock (Rosyth) decided to carry out the rest stages of the QEC design (Stages 2 & 3) using FORAN.

For SENER, the most important challenge was derived from the size and the complexity of the vessel together with the requirement to work in a multi-CAD and multi-site environment. Scalability, for both number of users and amount of data, and performance were also critical for the project. An additional challenge was to train a huge number of users (more than 1,000) as well as to provide on-site support from SENER to the main QEC design centres, as for BAE and for Babcock it was the first project developed with FORAN.

As part of the implementation process, SENER was required to develop additional capabilities in FORAN like more powerful access control functionalities or specific manufacturing links (e.g. for NC profile cutting robots).

The use of FORAN in the QEC has represented a step forward in the use of digital mock-up techniques in all disciplines and stages of the carrier’s design, with satisfactory results in both cost and schedule.

[mappress] Press Release, October 07, 2014; Image: SENER Marine

Reach the Naval Today industry in one go!

Naval Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Naval Today on:

Filed under

ContractsCapital InvestmentsVesselsShipbuildingSurface VesselsAmphibious & Support ShipsContracts & Tenders

Daily naval, defence and maritime news in your mailbox.

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1UK changes gun plan for new FSS ships
  2. 2Mitsubishi Shipbuilding starts work on PCG's MRRVs
  3. 3DNV, Fassmer link up on autonomous naval vessels
  4. 4German Navy fires IAI’s LORA ballistic missile

Daily naval, defence and maritime news in your mailbox.

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free