Naval Today
  • Vessels
  • Equipment & Technology
  • Operations
  • Capital Investments
  • Authorities
  • More news
JobsNewsletter
Naval Today logo

Your trusted source for naval and maritime news, part of the Navingo network.

Topics
  • Equipment & technology
  • Industry
  • Vessels
  • Operations
  • Training & Education
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Surface Vessels›USS John C. Stennis Raises Its Flag
Surface Vessels

November 10, 2014 · about 11 years ago

USS John C. Stennis Raises Its Flag

US Navy’s Nimitz-class aircraft carrier USS John C. Stennis (CVN 74) reached the end of one journey and began a new one on November 5. For the first time in over a year the American flag was raised on the ship’s mast. Stennis was ready to return to sea, the last phase of her docking planned [&hellip

2 minutes read
  • LinkedIn
  • X
  • Email

US Navy’s Nimitz-class aircraft carrier USS John C. Stennis (CVN 74) reached the end of one journey and began a new one on November 5.

For the first time in over a year the American flag was raised on the ship’s mast. Stennis was ready to return to sea, the last phase of her docking planned incremental availability (DPIA) period. After a successful six-day sea trial, the ship returned to homeport in Bremerton, Washington November 10 fully certified as a Naval operational asset.

The aircraft carrier had been stationed at Puget Sound Naval Shipyard (PSNS) and Intermediate Maintenance Facility in Bremerton for the past 16 months, where it received upgrades to its firefighting, navigation, weapons and combat systems. Major evolutions during DPIA ranged from the removal and maintenance of Stennis’ rudder and propellers during dry dock to the implementation of the Consolidated Afloat Network Enterprise Services (CANES) system. In total, the project comprised over 92,000 man hours.

In addition to renovations, Stennis organized and applied command-wide training, general knowledge tests and drills for the crew in order to meet fast cruise and underway deadlines. It was all part of certifying the ship’s crew for their long-awaited sea trials.

During sea trials, Stennis tested its equipment and emergency protocols, performing high-power turns, running damage control drills and acclimating new crew members to life at sea.

Lt. Cmdr. Todd Nelson, from Bremerton, Washington, said:

Sea trials is the culmination of DPIA.

It is the capstone that will test all the work performed on the ship, from main engine work to steam valves and catapults, to ensure everything is fully operational.

Stennis will continue looking ahead as it tackles future developments in the upcoming months. These evolutions include certifying the carrier’s flight deck so that it can support Carrier Air Wing 9 and other West Coast squadrons, as well as coordinated training with the John C. Stennis Carrier Strike Group in group sails off the West Coast. Before deployment, Stennis must also carry out an extended training period called “workups” and complete a thorough ship inspection and survey evaluation.

[mappress mapid=”14392″]

Press release, Image: US Navy

Reach the Naval Today industry in one go!

Naval Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Naval Today on:

Filed under

Surface VesselsVesselsEquipment & technologySensors & Combat SystemsPropulsionAmphibious & Support ShipsOperations

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Canada and UK firms join forces to expand autonomous vessel operations in North America
  2. 2Australia invests another $4.6 billion in AUKUS submarine construction yard
  3. 3US Navy's final expeditionary sea base wraps up acceptance trials
  4. 4HII expands distributed shipbuilding model to US Navy amphibious ships

Related articles

Damen
Surface Vessels

Damen to refit four Royal Bahamas Defence Force vessels

1 day ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Damen
Surface Vessels

Damen to refit four Royal Bahamas Defence Force vessels

1 day ago