Naval Today
  • Vessels
  • Equipment & Technology
  • Operations
  • Capital Investments
  • Authorities
  • More news
JobsNewsletter
Naval Today logo

Your trusted source for naval and maritime news, part of the Navingo network.

Topics
  • Equipment & technology
  • Industry
  • Vessels
  • Operations
  • Training & Education
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Surface Vessels›Austal Hosts Keel Laying Ceremony for Future USS Tulsa
Surface Vessels

January 12, 2016 · about 10 years ago

Austal Hosts Keel Laying Ceremony for Future USS Tulsa

Austal hosted a keel-laying ceremony for the future USS Tulsa (LCS 16) on January 11th, marking the first significant milestone in the ship’s construction. This ship is the sixth Independence-variant littoral combat ship (LCS) built at Austal under the 10-ship, $3.5 billion block buy contract awarde

2 minutes read
  • LinkedIn
  • X
  • Email

Austal hosted a keel-laying ceremony for the future USS Tulsa (LCS 16) on January 11th, marking the first significant milestone in the ship’s construction. This ship is the sixth Independence-variant littoral combat ship (LCS) built at Austal under the 10-ship, $3.5 billion block buy contract awarded to Austal in 2010.

Ship sponsor Kathy Taylor, former Tulsa mayor and CEO of ImpactTulsa, authenticated the keel by welding her initials onto an aluminum plate that will be placed in the hull of the ship.

“It amazes me how fast this ship is coming together.” Austal USA President Craig Perciavalle said. “The speedy construction of this amazing ship is evidence of the rapid maturity of Austal’s LCS program, a testament to the extreme level of talent and experience displayed by Austal’s shipbuilding team.”

Austal’s LCS program delivered USS Independence (LCS 2) in 2009, USS Coronado (LCS 4) in 2013, and USS Jackson (LCS 6) in 2015. Six additional LCS are under construction at the Mobile, Ala. shipyard. Montgomery (LCS 8) and Gabrielle Giffords (LCS 10) are preparing for builders trials later this year. Omaha (LCS 12) was christened Dec. 19, and Manchester (LCS 14) will complete final assembly and prepare for launch later this year. Modules for Charleston (LCS 18) are under construction as well.

Austal is also building 10 Expeditionary Fast Transports (EPF) for the U.S. Navy under a $1.6 billion block-buy contract. USNS Trenton (EPF 5) marked the fifth vessel in this class to be delivered since the inception of the program. Both USNS Spearhead (EPF 1) and USNS Millinocket (EPF 3) are currently deployed supporting Naval fleet operations.

[mappress mapid=”17586″]

Reach the Naval Today industry in one go!

Naval Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Naval Today on:

Filed under

Surface VesselsVesselsAmphibious & Support Ships

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1First forward-deployed Virginia-class sub completes Pacific mission
  2. 2Italian Navy's second next-gen minehunter reaches construction milestone
  3. 3Indian Navy launches seventh ASW SWC at Cochin Shipyard
  4. 4US Navy retires Freedom-variant LCS USS Fort Worth

Related articles

ASW SWC
Surface Vessels

Indian Navy launches seventh ASW SWC at Cochin Shipyard

20 hours ago

LCS
Surface Vessels

US Navy retires Freedom-variant LCS USS Fort Worth

21 hours ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

ASW SWC
Surface Vessels

Indian Navy launches seventh ASW SWC at Cochin Shipyard

20 hours ago
LCS
Surface Vessels

US Navy retires Freedom-variant LCS USS Fort Worth

21 hours ago