Naval Today
  • Vessels
  • Equipment & Technology
  • Operations
  • Capital Investments
  • Authorities
  • More news
JobsNewsletter
Naval Today logo

Your trusted source for naval and maritime news, part of the Navingo network.

Topics
  • Equipment & technology
  • Industry
  • Vessels
  • Operations
  • Training & Education
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Contracts›GE works with GD and US Navy on improving LM2500 gas turbine
Contracts

August 17, 2016 · about 10 years ago

GE works with GD and US Navy on improving LM2500 gas turbine

GE’s Marine Solutions announced recently that the LM2500 gas turbine Module Modernization Program (MMP) that the company undertakes with General Dynamics Bath Iron Works and the United States Navy was now underway. The goal of the MMP, as GE said, will be to inject updated technology into the gas tu

2 minutes read
  • LinkedIn
  • X
  • Email

GE’s Marine Solutions announced recently that the LM2500 gas turbine Module Modernization Program (MMP) that the company undertakes with General Dynamics Bath Iron Works and the United States Navy was now underway.

The goal of the MMP, as GE said, will be to inject updated technology into the gas turbine module system and reduce enclosure weight by approximately 50%, with the base structure excluded.

According to the company, the U.S. Navy is GE’s largest marine gas turbine customer with over 350 LM2500 engines in operation across multiple programs including DDG-51 Arleigh Burke, LCS-2 Independence and LHA-6 America-class ships.

Products developed under the MMP will be introduced to the U.S. Navy’s DDG-51 program starting with Flight III.

The modernization program focuses on composite initiatives including the enclosure, inlet barrier wall and inlet screen. The MMP also targets gas turbine and package sensors to improve condition monitoring and manufacturability.

As GE explains, all bolted joints between the walls and roof panels will be eliminated in the composite enclosure to improve noise attenuation and simplify assembly. The composite enclosure will feature improved entry points via the addition of an access panel to the inlet plenum, enlarged rear access panels and improved top access hatch design (see diagram below). The company says these enhancements will significantly reduce the weight of the door and the hatch and will improve ingress/egress, especially in the nose-down orientation on board ship.

GE’s Brien Bolsinger , vice president, general manager, Evendale, Ohio, said: “ For the MMP, the infusion of new technologies will improve the manufacturing and maintainability of the LM2500 marine module, all the while reducing module weight, noise, radiated heat – and most importantly – life cycle costs.”

“The new marine module will meet global naval requirements, including Mil 901D shock. Once available in 2018, this lightweight design can easily be applied to LM2500 family gas turbines used by other international navies,” he added.

Detailed design for MMP products is ongoing, with extensive fire testing on subcomponents planned for 2016. The prototype enclosure is expected to be complete in April 2017, and full scale fire, shock, noise and vibration testing is planned to be completed mid-2018. The new composite enclosure will be available by the fourth quarter 2018, the company said.

Reach the Naval Today industry in one go!

Naval Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Naval Today on:

Filed under

ContractsCapital InvestmentsVesselsSurface VesselsOperationsTraining & EducationContracts & Tenders

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Canada and UK firms join forces to expand autonomous vessel operations in North America
  2. 2Australia invests another $4.6 billion in AUKUS submarine construction yard
  3. 3US Navy's final expeditionary sea base wraps up acceptance trials
  4. 4HII expands distributed shipbuilding model to US Navy amphibious ships

Related articles

Fincantieri cuts steel for Italian Navy’s second FREMM EVO frigate
Surface Vessels

Fincantieri cuts steel for Italian Navy’s second FREMM EVO frigate

5 days ago

US, partners sink decommissioned cruiser and amphibious assault ship during RIMPAC 2026
Training & Education

US, partners sink decommissioned cruiser and amphibious assault ship during RIMPAC 2026

5 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Fincantieri cuts steel for Italian Navy’s second FREMM EVO frigate
Surface Vessels

Fincantieri cuts steel for Italian Navy’s second FREMM EVO frigate

5 days ago
US, partners sink decommissioned cruiser and amphibious assault ship during RIMPAC 2026
Training & Education

US, partners sink decommissioned cruiser and amphibious assault ship during RIMPAC 2026

5 days ago