Naval Today
  • Vessels
  • Equipment & Technology
  • Operations
  • Capital Investments
  • Authorities
  • More news
JobsNewsletter
Naval Today logo

Your trusted source for naval and maritime news, part of the Navingo network.

Topics
  • Equipment & technology
  • Industry
  • Vessels
  • Operations
  • Training & Education
Network
  • NavalToday
  • Dredging Today
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Surface Vessels›932-metric ton John F. Kennedy (CVN 79) lower stern lifted into place
Surface Vessels

June 23, 2017 · about 9 years ago

932-metric ton John F. Kennedy (CVN 79) lower stern lifted into place

U.S. Navy future aircraft carrier John F. Kennedy (CVN 79) became 932-metric tons heavier after shipbuilder Huntington Ingalls Industries lifted the carrier’s 70-feet-long lower stern into place on June 22. The lower stern was lifted into place at the company’s Newport News Shipbuilding division, wh

2 minutes read
  • LinkedIn
  • X
  • Email

U.S. Navy future aircraft carrier John F. Kennedy (CVN 79) became 932-metric tons heavier after shipbuilder Huntington Ingalls Industries lifted the carrier’s 70-feet-long lower stern into place on June 22.

The lower stern was lifted into place at the company’s Newport News Shipbuilding division, where the second Gerald R. Ford-class aircraft carrier is now 50 percent structurally complete.

Like Ford, Kennedy is being built using modular construction, a process where smaller sections of the ship are welded together to form larger structural units (called “superlifts”), equipment is then installed, and the large superlifts are lifted into the dry dock using the company’s 1,050-metric ton gantry crane.

“This is a significant milestone in the ship’s construction schedule,” said Mike Shawcross , Newport News’ vice president, John F. Kennedy (CVN 79) and Enterprise (CVN 80) aircraft carrier construction. “We are halfway through lifting the units onto the ship, and many of the units are larger and nearly all are more complete than the CVN 78 lifts were. This is one of many lessons learned from the construction of the lead ship that are helping to reduce construction costs and improve efficiencies on Kennedy.”

After several days of preparations, the 932-metric ton lower stern lift took about an hour to complete, thanks to a team of about 25 shipbuilders—from riggers and the crane operator to shipwrights and ship fitters. The lower stern consists of 30 individual units and includes the ship’s rudders, steering gear rooms and electrical power distribution room.

According to the shipbuilder, the carrier is on track to be completed with 445 lifts, which is 51 fewer than Ford and 149 fewer than USS George H.W. Bush (CVN 77), the last Nimitz-class carrier.

Reach the Naval Today industry in one go!

Naval Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Naval Today on:

Filed under

Surface VesselsVessels

Daily Naval, Defence and Maritime News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Kongsberg to supply NSM equipment to US Marine Corps
  2. 2Fincantieri, PT PAL to modernize former Italian aircraft carrier
  3. 3UK's newest Astute-class submarine sets sail
  4. 4US Navy sets up new center to accelerate unmanned systems integration

Daily Naval, Defence and Maritime News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free