Naval Today
  • Vessels
  • Equipment & Technology
  • Operations
  • Capital Investments
  • Authorities
  • More news
JobsNewsletter
Naval Today logo

Your trusted source for naval and maritime news, part of the Navingo network.

Topics
  • Equipment & technology
  • Industry
  • Vessels
  • Operations
  • Training & Education
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Contracts›Portsmouth Naval Base boosting energy capacity
Contracts

August 3, 2017 · about 9 years ago

Portsmouth Naval Base boosting energy capacity

Royal Navy’s Portsmouth Naval Base will be receiving a new combined heat and power plant which will recycle energy, reduce carbon footprint and save the UK defense ministry up to £4million per year in energy costs. BAE Systems is beginning work to install the plant as energy and electrical requireme

1 minutes read
  • LinkedIn
  • X
  • Email

Royal Navy’s Portsmouth Naval Base will be receiving a new combined heat and power plant which will recycle energy, reduce carbon footprint and save the UK defense ministry up to £4million per year in energy costs.

BAE Systems is beginning work to install the plant as energy and electrical requirements at the naval base are set to increase when the Queen Elizabeth Class aircraft carriers arrive in their home port.

Chris Courtaux, Head of Engineering and Energy Services at BAE Systems, said: “By developing this new facility we will be able to recycle energy consumption on the naval base as well as deliver a significant cost saving. This is an innovative solution to support the largest warships ever built for the Royal Navy.

A CHP system produces electricity and heat from a single fuel source and is able to retain excess heat which would have otherwise be wasted, the company explained.

To create this new facility a former boiler house will be converted into and is due to be completed by the end of 2018.

The £12million contract for the CHP facility forms an amendment to the Maritime Services Delivery Framework (MSDF) contract, awarded to BAE Systems by the Ministry of Defence in 2014. Under the MSDF contract, BAE Systems manages Portsmouth Naval Base on behalf of the Royal Navy, as well as supporting half of the Royal Navy’s surface fleet on UK and global operations.

Reach the Naval Today industry in one go!

Naval Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Naval Today on:

Filed under

ContractsCapital InvestmentsVesselsShipbuildingAmphibious & Support ShipsContracts & Tenders

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1HII expands distributed shipbuilding model to US Navy amphibious ships
  2. 2Damen to refit four Royal Bahamas Defence Force vessels
  3. 3OPTICS11 lands Dutch MoD contract for containerized towed array system
  4. 4TKMS and Navantia join hands on submarine projects

Related articles

Fincantieri cuts steel for Italian Navy’s second FREMM EVO frigate
Surface Vessels

Fincantieri cuts steel for Italian Navy’s second FREMM EVO frigate

4 days ago

Exail integrates Elistair’s tethered drone on DriX USV
Cyber & Electronic Warfare

Exail integrates Elistair’s tethered drone on DriX USV

5 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Fincantieri cuts steel for Italian Navy’s second FREMM EVO frigate
Surface Vessels

Fincantieri cuts steel for Italian Navy’s second FREMM EVO frigate

4 days ago
Exail integrates Elistair’s tethered drone on DriX USV
Cyber & Electronic Warfare

Exail integrates Elistair’s tethered drone on DriX USV

5 days ago