Naval Today
  • Vessels
  • Equipment & Technology
  • Operations
  • Capital Investments
  • Authorities
  • More news
JobsNewsletter
Naval Today logo

Your trusted source for naval and maritime news, part of the Navingo network.

Topics
  • Equipment & technology
  • Industry
  • Vessels
  • Operations
  • Training & Education
Network
  • NavalToday
  • Dredging Today
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Amphibious & Support Ships›Ravestein delivers another caisson to Royal Navy
Amphibious & Support Ships

December 17, 2017 · about 8 years ago

Ravestein delivers another caisson to Royal Navy

Dutch steel-construction manufacturer Ravestein has delivered a new caisson to the UK Royal Navy for installation at Portsmouth Naval Base. With the new caisson in place, the naval base has reopened the former “14” dry dock for the first time since 2002. Reopening this dock takes the base capability

2 minutes read
  • LinkedIn
  • X
  • Email

Dutch steel-construction manufacturer Ravestein has delivered a new caisson to the UK Royal Navy for installation at Portsmouth Naval Base.

With the new caisson in place, the naval base has reopened the former “14” dry dock for the first time since 2002.

Reopening this dock takes the base capability up to 11 dry docks which can support ships up to the size of a Type 45 destroyer.

In October this year, Naval Base Devonport officially opened a new, 700-ton steel dock gate which was also delivered by Ravestein.

“Today is a significant moment in the regeneration of Portsmouth Naval Base,” Captain Bill Oliphant, captain of NB Portsmouth said. “14 Dock has been unavailable since 2002 so the arrival of this new caisson to give us access to this dock once again is a huge shift in capability.”

“A caisson is like a tailor made plug which fits into the end of the dry dock, forming a seal so that the dock itself can then be pumped empty of water, giving access to the underside of the ship that is in for maintenance.”

The new caisson is designed to remain in service for 25 years without the need for servicing. It also features an operating system involving electric pumps to pump out the ballast water rather than being blown out by compressed air. Routine maintenance and inspections can also be undertaken without the need to remove the caisson from service.

The caisson has already been put to the test with a full drain-down of the dry dock for maintenance crews to assess how much cleaning needs to be done to it before the first ship will be brought in for works.

Reach the Naval Today industry in one go!

Naval Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Naval Today on:

Filed under

Amphibious & Support ShipsVesselsSurface Vessels

Daily naval, defence and maritime news in your mailbox.

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Iran captured a Dive-LD: what the US Navy underwater drone was built to do
  2. 2Babcock extends Seaspan's support for Canada’s Victoria-class subs
  3. 3Spanish Navy orders MBDA's SIMBAD RC anti-missile systems
  4. 4L3Harris to deliver VAMPIRE counter-unmanned systems to US Navy

Daily naval, defence and maritime news in your mailbox.

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free