Naval Today
  • Vessels
  • Equipment & Technology
  • Operations
  • Capital Investments
  • Authorities
  • More news
JobsNewsletter
Naval Today logo

Your trusted source for naval and maritime news, part of the Navingo network.

Topics
  • Equipment & technology
  • Industry
  • Vessels
  • Operations
  • Training & Education
Network
  • NavalToday
  • Dredging Today
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Contracts›US Navy contracts BAE Systems for USS Anzio cruiser modernization
Contracts

December 21, 2017 · about 8 years ago

US Navy contracts BAE Systems for USS Anzio cruiser modernization

The US Navy has awarded BAE Systems a $45.3 million contract to modernize the Ticonderoga-class guided missile cruiser USS Anzio (CG 68). The Anzio will undergo six months of work at the company’s shipyard in Norfolk, Virginia, the ship’s homeport. The contract includes options that, if exercised, w

2 minutes read
  • LinkedIn
  • X
  • Email

The US Navy has awarded BAE Systems a $45.3 million contract to modernize the Ticonderoga-class guided missile cruiser USS Anzio (CG 68).

The Anzio will undergo six months of work at the company’s shipyard in Norfolk, Virginia, the ship’s homeport. The contract includes options that, if exercised, would bring the cumulative value to $53.1 million.

BAE Systems will perform ship alterations and miscellaneous repairs aboard the 567-foot-long Anzio, including the replacement of critical aluminium structures. The work is expected to begin in February and be completed in August 2018. The company’s Norfolk shipyard is currently performing the same long-term modernization work aboard the USS Vicksburg (CG 69).

“As our team wraps up the first stage of modernization work aboard the Vicksburg, we look forward to the arrival of the Anzio soon afterwards to start its cruiser-mod program,” said Dave Thomas, vice president and general manager of BAE Systems Norfolk Ship Repair. “This contract, along with other recent ship repair contracts, provides important work for our shipyard team, particularly for our skilled employees who work with aluminium structures aboard navy ships.”

The USS Anzio was commissioned in May 1992. The ship is the third East Coast-based guided missile cruiser to undergo the extensive repair and upgrade work under the Navy’s long-term cruiser modernization program. In addition to the Vicksburg, the company’s Norfolk shipyard began modernization work aboard the first East Coast ship in the program, the USS Gettysburg (CG 64). The company’s San Diego shipyard executed similar work aboard the USS Cowpens (CG 63).

Reach the Naval Today industry in one go!

Naval Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Naval Today on:

Filed under

ContractsCapital InvestmentsVesselsEquipment & technologyShipbuildingSurface VesselsWeapons SystemsContracts & Tenders

Daily Naval, Defence and Maritime News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Leonardo to provide electric propulsion systems for ROKN's KDDX destroyers
  2. 2Navantia launches Spanish Navy’s submarine intervention vessel (VIDEO)
  3. 3US Navy orders additional Hammerhead anti-submarine mine systems
  4. 4TKMS ATLAS UK wins UK contract for submarine torpedo defense system

Daily Naval, Defence and Maritime News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free