Naval Today
  • Vessels
  • Equipment & Technology
  • Operations
  • Capital Investments
  • Authorities
  • More news
JobsNewsletter
Naval Today logo

Your trusted source for naval and maritime news, part of the Navingo network.

Topics
  • Equipment & technology
  • Industry
  • Vessels
  • Operations
  • Training & Education
Network
  • NavalToday
  • Dredging Today
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Contracts›BAE Systems gets LHA 6, CG 71 repair contracts
Contracts

January 31, 2018 · about 8 years ago

BAE Systems gets LHA 6, CG 71 repair contracts

The US Navy has awarded BAE Systems two contracts totalling $54.8 million to modernize the amphibious assault ship USS America (LHA 6) and the guided missile cruiser USS Cape St. George (CG 71). Both contracts include options that, if exercised, would bring the total cumulative value of the awards t

2 minutes read
  • LinkedIn
  • X
  • Email

The US Navy has awarded BAE Systems two contracts totalling $54.8 million to modernize the amphibious assault ship USS America (LHA 6) and the guided missile cruiser USS Cape St. George (CG 71).

Both contracts include options that, if exercised, would bring the total cumulative value of the awards to $62.2 million.

“These contracts are important to expanding the service lives and capability of these Navy ships,” said David Thomas, vice president and general manager of BAE Systems San Diego Ship Repair. “Our work on board the America will keep the ship ready for immediate service. For the Cape St. George, it is the beginning of a four-year journey toward full modernization and the ability to serve in the fleet longer.”

The USS America was commissioned in October 2014. BAE Systems will perform hull, mechanical, and electrical repairs, as well as additional flight deck modifications to support F-35 Lightning II operations on board. Work on the 844-foot-long ship will be conducted at Naval Station San Diego by company employees and subcontractors. The modernization is expected to begin in March and be completed in December 2018.

The USS Cape St. George was commissioned in June 1993. BAE Systems will perform ship alternations and repairs aboard the 567-foot-long ship, including the replacement of critical aluminium structures and the removal of obsolete equipment, under the Navy’s cruiser modernization program. BAE Systems’ work on the Cape St. George, to be conducted at the company’s shipyard in San Diego, is expected to begin in March and be completed by January 2019.

Reach the Naval Today industry in one go!

Naval Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Naval Today on:

Filed under

ContractsCapital InvestmentsVesselsEquipment & technologyShipbuildingAmphibious & Support ShipsSurface VesselsWeapons SystemsAviationContracts & Tenders

Daily naval, defence and maritime news in your mailbox.

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Leonardo wins $96M contracts for MK 41 VLS electronics
  2. 2US Navy awards contract for CVN 82 material procurement
  3. 3Angolan Navy receives six HT-100 NAVAL unmanned helicopters
  4. 4Bangladesh Coast Guard taps MAURIC for five patrol vessels

Daily naval, defence and maritime news in your mailbox.

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free