Naval Today
  • Vessels
  • Equipment & Technology
  • Operations
  • Capital Investments
  • Authorities
  • More news
JobsNewsletter
Naval Today logo

Your trusted source for naval and maritime news, part of the Navingo network.

Topics
  • Equipment & technology
  • Industry
  • Vessels
  • Operations
  • Training & Education
Network
  • NavalToday
  • Dredging Today
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Surface Vessels›Second Ford-class carrier hull 70 percent complete
Surface Vessels

February 23, 2018 · about 8 years ago

Second Ford-class carrier hull 70 percent complete

The structures necessary to complete US Navy’s second Ford-class aircraft carrier John F. Kennedy (CVN 79) are 70 percent complete, shipbuilder Huntington Ingalls Industries has announced. Like its predecessor, the first-in-class USS Gerald R. Ford (CVN 78), Kennedy is being built with a modular con

1 minutes read
  • LinkedIn
  • X
  • Email

The structures necessary to complete US Navy’s second Ford-class aircraft carrier John F. Kennedy (CVN 79) are 70 percent complete, shipbuilder Huntington Ingalls Industries has announced.

Like its predecessor, the first-in-class USS Gerald R. Ford (CVN 78), Kennedy is being built with a modular construction technique where smaller sections of the ship are welded together to form larger structures called superlifts. The superlifts are pre-outfitted and hoisted into Dry Dock 12—where the ship is being built—by the company’s 1,050-metric ton gantry crane.

Shipbuilders have successfully erected 317 lifts since the ship’s keel was laid in August 2015. Kennedy is on track to be completed with 447 total lifts.

The recent 806-metric ton superlift consisted of 17 individual units and was about 171 feet long and about 92 feet wide. The structure comprises berthing areas, electrical equipment rooms and workshops and took 18 months to build.

“This superlift is in the forward part of the ship, about halfway between the bow and midship,” said Mike Butler, program director of CVN 79. “It represents one of the key build strategy changes for Kennedy: building superlifts that are larger and more complete before they are erected on the ship. We are pleased with how construction on the Kennedy is progressing, and we look forward to additional milestones as we inch closer to christening of the ship.”

Kennedy is scheduled to launch in 2020.

Reach the Naval Today industry in one go!

Naval Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Naval Today on:

Filed under

Surface VesselsVesselsAuthoritiesDefense Strategies

Daily Naval, Defence and Maritime News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Leonardo to provide electric propulsion systems for ROKN's KDDX destroyers
  2. 2Navantia launches Spanish Navy’s submarine intervention vessel (VIDEO)
  3. 3US Navy orders additional Hammerhead anti-submarine mine systems
  4. 4TKMS ATLAS UK wins UK contract for submarine torpedo defense system

Daily Naval, Defence and Maritime News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free