Naval Today
  • Vessels
  • Equipment & Technology
  • Operations
  • Capital Investments
  • Authorities
  • More news
JobsNewsletter
Naval Today logo

Your trusted source for naval and maritime news, part of the Navingo network.

Topics
  • Equipment & technology
  • Industry
  • Vessels
  • Operations
  • Training & Education
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Surface Vessels›German Navy frigate FGS Sachsen concludes operation Sophia deployment
Surface Vessels

May 8, 2018 · about 8 years ago

German Navy frigate FGS Sachsen concludes operation Sophia deployment

The first German Navy vessel to deploy in 2018 is returning home after concluding a five-month deployment to the Mediterranean Sea as part of the EU-led operation Sophia. FGS Sachsen, the lead ship of the German Navy’s F124 air defense frigates, is set to return to her homeport in Wilhelmshaven on M

1 minutes read
  • LinkedIn
  • X
  • Email

The first German Navy vessel to deploy in 2018 is returning home after concluding a five-month deployment to the Mediterranean Sea as part of the EU-led operation Sophia.

FGS Sachsen, the lead ship of the German Navy’s F124 air defense frigates, is set to return to her homeport in Wilhelmshaven on May 11.

The frigate and her crew spent a total of 120 days on operations. During this time, they sailed 20.000 nautical miles and rescued 403 migrants in the Mediterranean.

Sachsen got underway on January 5 to replace F123 frigate FGS Mecklenburg-Vorpommern which represented the German contribution to the EU operation from August 2017 to January 2018. In addition to her crew, Sachsen deployed with a team Slovakian boarding specialists.

Once they arrive home, the crew will enjoy a deserved break before getting underway for live fire drills off Norway in June.

FGS Sachsen is one of three F124 frigates in Germany Navy service. The ship was laid down at the Blohm+Voss shipyard in February 1999 and delivered to the navy in November 2002. The 143-meter ship displaces 5.800 tonnes and is powered by one gas turbine and two diesel engines.

Reach the Naval Today industry in one go!

Naval Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Naval Today on:

Filed under

Surface VesselsVesselsAuthoritiesCapital InvestmentsOperationsFundingTraining & EducationBusiness & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Canada and UK firms join forces to expand autonomous vessel operations in North America
  2. 2Australia invests another $4.6 billion in AUKUS submarine construction yard
  3. 3US Navy's final expeditionary sea base wraps up acceptance trials
  4. 4HII expands distributed shipbuilding model to US Navy amphibious ships

Related articles

Damen
Surface Vessels

Damen to refit four Royal Bahamas Defence Force vessels

1 day ago

Fincantieri cuts steel for Italian Navy’s second FREMM EVO frigate
Surface Vessels

Fincantieri cuts steel for Italian Navy’s second FREMM EVO frigate

5 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Damen
Surface Vessels

Damen to refit four Royal Bahamas Defence Force vessels

1 day ago
Fincantieri cuts steel for Italian Navy’s second FREMM EVO frigate
Surface Vessels

Fincantieri cuts steel for Italian Navy’s second FREMM EVO frigate

5 days ago