Naval Today
  • Vessels
  • Equipment & Technology
  • Operations
  • Capital Investments
  • Authorities
  • More news
JobsNewsletter
Naval Today logo

Your trusted source for naval and maritime news, part of the Navingo network.

Topics
  • Equipment & technology
  • Industry
  • Vessels
  • Operations
  • Training & Education
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Amphibious & Support Ships›Austal gets $57m long lead contract for 13th US Navy EPF
Amphibious & Support Ships

October 18, 2018 · about 7 years ago

Austal gets $57m long lead contract for 13th US Navy EPF

The US Navy has awarded Austal USA a $57.8 million order to fund the procurement of long lead-time materials for the construction of the 13th 103-meter Expeditionary Fast Transport (EPF). Long lead-time materials for the additional vessel will include diesel engines, water jets and reduction gears.

1 minutes read
  • LinkedIn
  • X
  • Email

The US Navy has awarded Austal USA a $57.8 million order to fund the procurement of long lead-time materials for the construction of the 13th 103-meter Expeditionary Fast Transport (EPF).

Long lead-time materials for the additional vessel will include diesel engines, water jets and reduction gears.

Austal was awarded the initial contract to design and build the first 103-meter EPF in November 2008.

EPF’s are non-combatant vessels designed to operate in shallow-draft ports and waterways, increasing operational flexibility for a wide range of activities including maneuver and sustainment, relief operations in small or damaged ports, flexible logistics support, or as the key enabler for rapid transport.

They are capable of interfacing with roll-on/roll-off discharge facilities, as well as on/off-loading vehicles such as a fully combat-loaded Abrams Main Battle Tank. Each vessel includes a flight deck to support day and night aircraft launch and recovery operations. They have airline-style seating for 312 embarked forces with fixed berthing for 104.

The EPF are also known as the Spearhead-class, after the lead ship. So far, nine ships have entered service while the tenth, future USNS Burlington, has completed builder’s trials and is expected to be delivered to the navy soon.

Reach the Naval Today industry in one go!

Naval Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Naval Today on:

Filed under

Amphibious & Support ShipsVessels

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Australia's Bisalloy to supply steel for US Navy Virginia-class submarines
  2. 2Canada and UK firms join forces to expand autonomous vessel operations in North America
  3. 3Australia invests another $4.6 billion in AUKUS submarine construction yard
  4. 4US Navy's final expeditionary sea base wraps up acceptance trials

Related articles

US Navy
Amphibious & Support Ships

US Navy's final expeditionary sea base wraps up acceptance trials

1 day ago

HII
Shipbuilding

HII expands distributed shipbuilding model to US Navy amphibious ships

1 day ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

US Navy
Amphibious & Support Ships

US Navy's final expeditionary sea base wraps up acceptance trials

1 day ago
HII
Shipbuilding

HII expands distributed shipbuilding model to US Navy amphibious ships

1 day ago