Naval Today
  • Vessels
  • Equipment & Technology
  • Operations
  • Capital Investments
  • Authorities
  • More news
JobsNewsletter
Naval Today logo

Your trusted source for naval and maritime news, part of the Navingo network.

Topics
  • Equipment & technology
  • Industry
  • Vessels
  • Operations
  • Training & Education
Network
  • NavalToday
  • Dredging Today
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Surface Vessels›GDBIW lays keel for US Navy’s 70th Arleigh Burke-class destroyer
Surface Vessels

February 3, 2019 · about 7 years ago

GDBIW lays keel for US Navy’s 70th Arleigh Burke-class destroyer

Shipbuilder General Dynamics Bath Iron Works (BIW) on February 1 hosted a keel laying ceremony for the future USS Carl M. Levin (DDG 120) at its shipyard in Bath, Maine. Sen. Levin and the ship’s sponsors, his three daughters, Kate Levin Markel, Erica Levin, and Laura Levin, authenticated the keel b

2 minutes read
  • LinkedIn
  • X
  • Email

Shipbuilder General Dynamics Bath Iron Works (BIW) on February 1 hosted a keel laying ceremony for the future USS Carl M. Levin (DDG 120) at its shipyard in Bath, Maine.

Sen. Levin and the ship’s sponsors, his three daughters, Kate Levin Markel, Erica Levin, and Laura Levin, authenticated the keel by etching their initials into the keel plate to symbolically recognize the joining of modular components and the ceremonial beginning of the ship construction.

“We are honored to be celebrating this milestone with Sen. Levin, Mrs. Levin, their daughters, and so many distinguished guests,” said Capt. Casey Moton, DDG 51 class program manager, Program Executive Office (PEO) Ships. “This has been a special occasion to lay the keel for our Nation’s 70th Arleigh Burke destroyer, and to do so with a namesake that shares the same sense of purpose and commitment to service as our sailors.”

The ship’s namesake served in the US Senate for 36 years from 1979-2015. As the longest serving senator in Michigan state history, Levin became a staunch supporter of the armed services through his work and leadership as Chairman and Ranking Member of the Senate Committee on Armed Services.

DDG 120 will be built in the Flight IIA configuration with the Aegis Baseline 9 Combat System which includes Integrated Air and Missile Defense capability. Delivery to the fleet is planned for Fiscal Year 2021.

In addition to Carl M. Levin (DDG 120), BIW has four additional Arleigh Burke class destroyers under construction – Daniel Inouye (DDG 118), John Basilone (DDG 122), Harvey C. Barnum Jr. (DDG 124) and Patrick Gallagher (DDG 127), as well as the Zumwalt class destroyer Lyndon B. Johnson (DDG 1002).

BIW is under contract for an additional six Arleigh Burke class destroyers that will all be constructed in the Flight III configuration with enhanced air and missile defense capabilities.

Reach the Naval Today industry in one go!

Naval Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Naval Today on:

Filed under

Surface VesselsVesselsCapital InvestmentsEquipment & technologyContractsSensors & Combat SystemsWeapons SystemsContracts & Tenders

Daily Naval, Defence and Maritime News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1UK urged to retain Type 23 frigates until Type 26 arrive amid 'serious' ASW gap
  2. 2Exail wins navy contract for USV navigation systems
  3. 3Sweden orders four Bofors naval gun systems from BAE Systems
  4. 4US Coast Guard awards $300M in infrastructure contracts

Daily Naval, Defence and Maritime News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free