Naval Today
  • Vessels
  • Equipment & Technology
  • Operations
  • Capital Investments
  • Authorities
  • More news
JobsNewsletter
Naval Today logo

Your trusted source for naval and maritime news, part of the Navingo network.

Topics
  • Equipment & technology
  • Industry
  • Vessels
  • Operations
  • Training & Education
Network
  • NavalToday
  • Dredging Today
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Amphibious & Support Ships›GD NASSCO cuts steel of future USNS Harvey Milk
Amphibious & Support Ships

December 23, 2019 · about 6 years ago

GD NASSCO cuts steel of future USNS Harvey Milk

General Dynamics-National Steel and Shipbuilding Company (GD-NASSCO) has launched the construction of the US Navy’s John Lewis-class oiler USNS Harvey Milk (T-AO 206). “This ship will have significant contributions as part of our Combat Logistics Force, serving as the primary fuel pipeline from resu

2 minutes read
  • LinkedIn
  • X
  • Email

General Dynamics-National Steel and Shipbuilding Company (GD-NASSCO) has launched the construction of the US Navy’s John Lewis-class oiler USNS Harvey Milk (T-AO 206).

“This ship will have significant contributions as part of our Combat Logistics Force, serving as the primary fuel pipeline from resupply ports to ships at sea,” said Mike Kosar, Support Ships, Boats and Craft program manager, Program Executive Office, Ships.

“Today’s (Dec 13) ceremony marks an important milestone as our Navy works to recapitalize our aging fleet replenishment capabilities, ensuring our warfighters have the resources they need to keep them combat year for years to come.”

The John Lewis-class ships are based on commercial design standards and will recapitalize the current T-AO 187 Class Fleet Replenishment Oilers to provide underway replenishment of fuel to U.S. Navy ships and jet fuel for aircraft assigned to aircraft carriers. These ships are part of the Navy’s Combat Logistics Force and will become the backbone of the fuel delivery system.

Harvey Milk will be operated by the Navy’s Military Sealift Command and is the first ship named after the Navy veteran and civil and human rights leader who became the first openly gay elected official in California when he won a seat on the San Francisco Board of Supervisors in 1977.

GD NASSCO is also in production on the first-in-class Fleet Replenishment Oiler, the future USNS John Lewis (T-AO 205) and is contracted for ships T-AO 207 – 210 as well as the Expeditionary Sea Base platforms (ESB 6-8).

Reach the Naval Today industry in one go!

Naval Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Naval Today on:

Filed under

Amphibious & Support ShipsVessels

Daily Naval, Defence and Maritime News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1US Navy orders LCU 1700 prototypes from three shipbuilders
  2. 2Royal IHC, Naval Group join forces on Dutch Navy's Orka-class subs
  3. 3US Navy moves Blackbeard hypersonic weapon into production
  4. 4Boeing gets $562M US Navy contract for three MQ-25A Stingrays

Daily Naval, Defence and Maritime News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free