Naval Today
  • Vessels
  • Equipment & Technology
  • Operations
  • Capital Investments
  • Authorities
  • More news
JobsNewsletter
Naval Today logo

Your trusted source for naval and maritime news, part of the Navingo network.

Topics
  • Equipment & technology
  • Industry
  • Vessels
  • Operations
  • Training & Education
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Vessels›Damen lays keel of CSS Den Helder
Vessels

June 2, 2021 · about 5 years ago

Damen lays keel of CSS Den Helder

Romanian Damen Shipyards Galați has performed the keel-laying ceremony on the combat support ship (CSS) Den Helder for the Royal Netherlands Navy.

2 minutes read
  • LinkedIn
  • X
  • Email
Damen lays keel of CSS Den Helder
Courtesy of Damen

Damen Shipyards Galați has performed the keel-laying ceremony on the combat support ship (CSS) Den Helder for the Royal Netherlands Navy.

The steel cutting was carried out by the Romanina shipyard in December 2020.

The keel-laying ceremony was performed by the vice-admiral Arie Jan de Waard , the director defence material organisation, and vice-admiral Rob Kramer , commander of Royal Netherlands Navy (RNLN).

In the past, a coin was placed under the wooden mast for prosperity during the ceremony. Now, the coin is placed under the keel block. Both admirals performed this operation for the CSS, placing a coin from 1822 for the occasion.

Following the keel-laying, all the building blocks for the actual construction of the ship in Romania are now ready. The engineering of the CSS has been largely carried out in the Netherlands as well.

The building of the ship is expected to be completed in 2023. After that, the naming ceremony will be held.

After commissioning, testing and shipyard trials the ship will sail to Den Helder, where the accessories and the combat management system will be installed before the ship is transferred to the navy in 2025.

Damen Naval division director Hein van Ameijden said: “More than a year after signing the contract for this ship, Damen Naval has concluded 116 purchase contracts, of which 82 are with Dutch suppliers. These are with companies coming mostly from the Rijnmond and Zeeland areas. It is this entire chain of companies that contributes to the construction of this new ship for the RNLN.”

The nearly 180-metre-long ship is based on the Joint Support Ship HNLMS Karel Doorman , previously built by Damen.

Reach the Naval Today industry in one go!

Naval Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Naval Today on:

Filed under

Vessels

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1First forward-deployed Virginia-class sub completes Pacific mission
  2. 2Italian Navy's second next-gen minehunter reaches construction milestone
  3. 3Indian Navy launches seventh ASW SWC at Cochin Shipyard
  4. 4US Navy retires Freedom-variant LCS USS Fort Worth

Related articles

ASW SWC
Surface Vessels

Indian Navy launches seventh ASW SWC at Cochin Shipyard

1 day ago

LCS
Surface Vessels

US Navy retires Freedom-variant LCS USS Fort Worth

1 day ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

ASW SWC
Surface Vessels

Indian Navy launches seventh ASW SWC at Cochin Shipyard

1 day ago
LCS
Surface Vessels

US Navy retires Freedom-variant LCS USS Fort Worth

1 day ago