Equipment & technology

about 2 years ago

Raytheon wraps up hydrodynamic testing for Barracuda mine neutralization system

Raytheon, an RTX business, has conducted a series of controlled environmental tests for the Barracuda mine neutralization system at the Naval Surface Warfare Center Carderock Division. Using a production representative test unit, Barracuda operated and collected data in environments of various sea s

2 minutes read
Raytheon wraps up hydrodynamic testing for Barracuda mine neutralization system
Raytheon

Raytheon, an RTX business, has conducted a series of controlled environmental tests for the Barracuda mine neutralization system at the Naval Surface Warfare Center Carderock Division.

Using a production representative test unit, Barracuda operated and collected data in environments of various sea states and water currents, demonstrating the ability to hydrodynamically control itself in conditions simulating the ocean.

The test demonstrated the ability of the vehicle to detect, track and hold position on a target on its own. It was the first time Raytheon had executed this type of testing with the Barracuda mine neutralizer underwater vehicle and moves the program one step closer towards meeting operational requirements, according to the company.

“This event marks a significant milestone in the advancement of underwater security and naval defense,” said Barbara Borgonovi , president of Naval Power at Raytheon.

“Barracuda’s performance reaffirms its position as a game-changing solution for identifying and neutralizing naval mines, a critical challenge in modern naval operations.”

Barracuda is the U.S. Navy’s program of record for next-generation mine neutralization. It is a semi-autonomous system that uses sonar and camera systems to locate and neutralize undersea mine threats.

Advertisement

Raytheon was first awarded a contract for Barracuda in 2018. The program completed its critical design review in March 2023, and has now entered its qualification testing phase.

In July 2023, Raytheon was awarded a contract to deliver engineering development model units to the U.S. Navy. The program will go into low-rate initial production in 2027.

Reach the Naval Today industry in one go!

Naval Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Naval Today on:

Daily Naval, Defence and Maritime News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.