Naval Today
  • Vessels
  • Equipment & Technology
  • Operations
  • Capital Investments
  • Authorities
  • More news
JobsNewsletter
Naval Today logo

Your trusted source for naval and maritime news, part of the Navingo network.

Topics
  • Equipment & technology
  • Industry
  • Vessels
  • Operations
  • Training & Education
Network
  • NavalToday
  • Dredging Today
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Vessels›Textron Systems hands over LCAC 115 to US Navy
Vessels

March 13, 2026 · about 6 months ago

Textron Systems hands over LCAC 115 to US Navy

Textron Systems has delivered the new ship-to-shore connector (SSC), landing craft air cushion (LCAC) 115 to the US Navy.

2 minutes read
  • LinkedIn
  • X
  • Email
Textron Systems hands over LCAC 115 to US Navy
Credit: US Navy

Textron Systems has delivered the new ship-to-shore connector (SSC), landing craft air cushion (LCAC) 115 to the US Navy.

The delivery of LCAC 115, which took place on March 10, comes after completion of acceptance yrials conducted by the navy’s Board of Inspection and Survey, which tested the readiness and capability of the craft.

With delivery complete, the craft will transition for fleet integration, crew training, and certification in preparation for operational employment.

LCAC 115 is said to increase navy’s capacity to move personnel, vehicles, and equipment across contested littoral environments, directly supporting distributed maritime operations and global crisis response.

“LCAC 115 represents the continuation of Amphibious capability being delivered to the Fleet,” said Capt. Chris Causee , program manager, Amphibious Assault and Connectors Programs, Program Executive Office (PEO) Ships.

“Our focus is accelerating the transition from delivery to readiness for operational employment. Each additional connector strengthens the Navy-Marine Corps team’s ability to maneuver, sustain, and respond decisively in complex environments.”

SSC retains the dimensions and well deck compatibility of the legacy LCAC. The units are fully compatible with well-deck-equipped amphibious ships. The craft carries a 60-to-75-ton payload and transports weapon systems, vehicles, cargo, and assault personnel across open ocean and over the beach.

Textron Systems is in serial production for LCACs 116-129. In September last year, Textron handed over LCAC 114. In July 2025, the navy awarded a $353.9 million contract modification to the company to build three additional LCAC vessels.

Related Articles

Textron Systems delivers LCAC 114 to US Navy

US Navy orders three more LCAC vessels from Textron Systems

Reach the Naval Today industry in one go!

Naval Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Naval Today on:

Filed under

Vessels

Daily Naval, Defence and Maritime News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Leonardo to provide electric propulsion systems for ROKN's KDDX destroyers
  2. 2Navantia launches Spanish Navy’s submarine intervention vessel (VIDEO)
  3. 3US Navy orders additional Hammerhead anti-submarine mine systems
  4. 4TKMS ATLAS UK wins UK contract for submarine torpedo defense system

Daily Naval, Defence and Maritime News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free