Naval Today
  • Vessels
  • Equipment & Technology
  • Operations
  • Capital Investments
  • Authorities
  • More news
JobsNewsletter
Naval Today logo

Your trusted source for naval and maritime news, part of the Navingo network.

Topics
  • Equipment & technology
  • Industry
  • Vessels
  • Operations
  • Training & Education
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Authorities›Steel cut for German Navy’s third and final Type 424 intelligence vessel
Steel cut for German Navy’s third and final Type 424 intelligence vessel

A steel-cutting ceremony for Germany’s third and final Type 424 intelligence vessel took place on April 16 at the Peene-Werft shipyard in Wolgast.

The ceremony, which was attended by representatives from the Bundeswehr (the German Armed Forces), was carried out much earlier than planned, according to Rheinmetall, a Düsseldorf-based technology group that recently took over NVL, the shipbuilder in charge of constructing the vessels.

Reach the Naval Today industry in one go!

Naval Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Naval Today on:

Filed under

AuthoritiesEquipment & technologyDefense StrategiesSensors & Combat Systems

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Related articles

Exail integrates Elistair’s tethered drone on DriX USV
Cyber & Electronic Warfare

Exail integrates Elistair’s tethered drone on DriX USV

4 days ago

UK buys strategic energy site to support future naval operations

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Exail integrates Elistair’s tethered drone on DriX USV
Cyber & Electronic Warfare

Exail integrates Elistair’s tethered drone on DriX USV

4 days ago
UK buys strategic energy site to support future naval operations
Authorities

UK buys strategic energy site to support future naval operations

5 days ago

The approximately 130-meter-long Type 424 intelligence vessels will serve the German Armed Forces as reconnaissance platforms for maritime-based intelligence gathering and are equipped with modern sensor technology. Their design meets the latest military requirements for future-proof naval ships, it was stated.

Once commissioned, the intelligence vessel will be used jointly by the German Navy and the Cyber and Information Domain Service (CIR).

“Beginning the steel cutting early means that all ships of this class are now under construction. This is far more than just a technical milestone—it is a strategic signal. In the current geopolitical security environment, which is changing faster than ever before, we, as an industrial partner, are doing our part to accelerate strengthening defence capabilities. Speed is now a security-relevant factor—and this is exactly what we are focussing on,” said Tim Wagner , CEO of Rheinmetall’s Naval Systems division.

To remind, in September last year, NVL held a steel-cutting ceremony for the second Type 424 intelligence vessel being built for the German Navy.

This initiative is part of a €3.3 billion project aimed at constructing three signals intelligence (SIGINT) and reconnaissance vessels, which will replace the aging Oste-class ships that have been in service since the late 1980s.

Related Articles

Vessels

NVL: Construction starts on German Navy’s second Type 424 intelligence vessel

2 min read
Authorities

UK buys strategic energy site to support future naval operations

5 days ago

Authorities

April 16, 2026 · about 3 months ago

Steel cut for German Navy’s third and final Type 424 intelligence vessel

A steel-cutting ceremony for Germany’s third and final Type 424 intelligence vessel took place on April 16 at the Peene-Werft shipyard in Wolgast.

2 minutes read
  • LinkedIn
  • X
  • Email

Trending Now

  1. 1Damen to refit four Royal Bahamas Defence Force vessels
  2. 2OPTICS11 lands Dutch MoD contract for containerized towed array system
  3. 3TKMS and Navantia join hands on submarine projects
  4. 4Fincantieri cuts steel for Italian Navy’s second FREMM EVO frigate