Naval Today
  • Vessels
  • Equipment & Technology
  • Operations
  • Capital Investments
  • Authorities
  • More news
JobsNewsletter
Naval Today logo

Your trusted source for naval and maritime news, part of the Navingo network.

Topics
  • Equipment & technology
  • Industry
  • Vessels
  • Operations
  • Training & Education
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Surface Vessels›Navantia lays keel of Spanish Navy’s third F110 frigate
Navantia lays keel of Spanish Navy’s third F110 frigate

Spanish shipbuilder Navantia has reached a new milestone in the Spanish Navy’s F110 frigate program with the keel laying of the third vessel in the class, F113 Menéndez de Avilés, at the company’s Ferrol shipyard.

As informed, the construction milestone was achieved seven months ahead of the contractual schedule, highlighting the strong progress of the F110 program and the close collaboration between Navantia and Spain’s Ministry of Defense. The keel laying marks the beginning of a new phase in the frigate’s construction, with block assembly now continuing on slipway 2, where the first-in-class F111 Bonifaz was previously built, ahead of the vessel’s planned launch.

Reach the Naval Today industry in one go!

Naval Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Naval Today on:

Filed under

Surface VesselsVessels

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Related articles

Exail integrates Elistair’s tethered drone on DriX USV
Cyber & Electronic Warfare

Exail integrates Elistair’s tethered drone on DriX USV

4 days ago

Indian Navy commissions second Mahe-class ASW-SWC

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Exail integrates Elistair’s tethered drone on DriX USV
Cyber & Electronic Warfare

Exail integrates Elistair’s tethered drone on DriX USV

4 days ago
Indian Navy commissions second Mahe-class ASW-SWC
Amphibious & Support Ships

Indian Navy commissions second Mahe-class ASW-SWC

4 days ago

The F110 program continues to progress across multiple construction stages at Navantia’s Ferrol shipyard. The lead ship of the class, F111 Bonifaz, is currently afloat at berth 10, where the installation and commissioning of major systems are underway ahead of the start of sea trials.

Upcoming milestones include the activation of the integrated platform management system and the installation of the SPY-7 radar, with delivery to the Spanish Navy planned for 2028, according to Navantia.

The second frigate, F112 Roger de Lauria, has reached a key construction milestone following the completion of its main hull structure with the installation of the bow block. The vessel is now being prepared for launch after the summer, with preliminary activities for the launch ceremony already underway.

Meanwhile, construction of the fourth frigate, F114 Luis de Córdova, is in its early stages, coinciding with the commissioning of Navantia’s new Digital Block Factory at Ferrol. The advanced facility, designed to modernize and streamline military shipbuilding processes, is expected to become fully operational in the coming weeks and represents a major transformation of the shipyard’s production capabilities.

The frigates are multi-purpose ships, with anti-submarine, anti-air and anti-surface capabilities, and are also prepared for hybrid warfare and new threats.

They represent a qualitative leap in the Spanish Navy’s operational capabilities, as well as a step forward in the industrial and technological potential of Navantia and its entire collaborating industry. The programme helps strengthen Spain’s strategic autonomy and generate a moderrn industrial and technological base, while opening up new export opportunities.

Related Articles

Vessels

Spanish Navy’s F-110 frigate program hits a milestone

2 min read
Amphibious & Support Ships

Indian Navy commissions second Mahe-class ASW-SWC

4 days ago

Surface Vessels

July 21, 2026 · 6 days ago

Navantia lays keel of Spanish Navy’s third F110 frigate

Spanish shipbuilder Navantia has reached a new milestone in the Spanish Navy’s F110 frigate program with the keel laying of the third vessel in the class, F113 Menéndez de Avilés, at the company’s Ferrol shipyard.

2 minutes read
  • LinkedIn
  • X
  • Email

Trending Now

  1. 1Fincantieri cuts steel for Italian Navy’s second FREMM EVO frigate
  2. 2US, partners sink decommissioned cruiser and amphibious assault ship during RIMPAC 2026
  3. 3US Navy awards contract for mid-range maritime strike missile
  4. 4Babcock and LIG D&A team up on AH-140 frigate, missiles and unmanned systems