U.S. Navy’s Bonhomme Richard Expeditionary Strike Group was joined by a U.S. destroyer and four Australian frigates to test elements of the up-gunned ESG concept during two weeks of drills at exercise Talisman Saber 2017. The field training exercise (FTX) component of TS17 tested a combined and join
U.S. Navy aircraft carrier USS George H.W. Bush and ships from its carrier strike group arrived in Portsmouth, UK, today ahead of a major two-week drill. Accompanied by the USS Philippine Sea, USS Donald Cook and Norwegian ship HNoMS Helge Insgstad, the aircraft carrier is on the final leg of its de
Armed forces from 19 nations concluded two weeks of multinational exercises and events at-sea and in port, in Loma, Peru. The 58th iteration of the longest running multinational naval exercise closed on July 26. Participating nations utilized 30 vessels, 28 aircraft as well as several submarines and
The combined U.S.-Australian exercise Talisman Saber 2017 concluded in Brisbane on July 25 after 30 days of high-end, mid-intensity warfighting scenarios. Two years in the planning, Talisman Saber involved approximately 33,000 participants, 36 warships and over 220 aircraft. Luke Howarth MP, Austral
The U.S. Navy and Air Force awarded Lockheed Martin the first production contract for the air-launched variant of the Long Range Anti-Ship Missile (LRASM) on July 25. Worth $86.5 million, the contract will see the company deliver 23 missiles and engineering support. Low-rate initial production Lot 1
U.S. Military Sealift Command ships completed a series of “skin-to-skin” operations in the vicinity of Saipan last month, honing teamwork skills. During the 17 days of exercises expeditionary transfer dock USNS Montford Point (T-ESD 1) trained with ships from Maritime Prepositioning Squadron Three (
U.S. Navy aircraft carrier USS Harry S. Truman (CVN 75) wrapped up five days of sea trials returning to its homeport at Naval Station Norfolk on July 25. This was Truman’s first time underway in nearly a year, as the ship underwent a planned incremental availability (PIA), which began last September
The issue of the U.S. Navy’s electromagnetic aircraft launch system (EMALS) causing too much stress on F/A-18E/F Super Hornet and EA-18G Growler aircraft outfitted with wing-mounted, 480-gallon external fuel tanks (EFTs), has been resolved. According to an announcement from the U.S. Naval Air System
The recently-commissioned San Antonio-class amphibious transport dock USS John P. Murtha (LPD 26) returned to Naval Base San Diego, July 21, after completing final contract trials (FCT). The USS John P. Murtha was commissioned in October 2016 in Philadelphia and arrived at her San Diego homeport in
The U.S. Navy’s newest amphibious assault ship USS America (LHA 6), currently on its maiden deployment, completed the first connective replenishment (CONREP), as well as first replenishment-at-sea (RAS) and vertical replenishment (VERTREP) on July 19. The supplies were provided by the Military Seali
The U.S. Naval Sea Systems Command has awarded Lockheed Martin Rotary and Mission Systems a $119 million contract extension for further work on the U.S. Navy’s Integrated Submarine Imaging Systems (ISIS) program. ISIS is a system that captures and distributes high-definition video and photographic d
Warm-up exercises are already underway as Japanese and U.S. forces prepare for more complex scenarios of the annual 2JA mine countermeasure exercise (2JA MCMEX). The annual exercise, which officially began July 19, brings together Japan Maritime Self-Defense Force (JMSDF) and U.S. Navy surface and a
The U.S. Coast Guard has shared a video of its MH-60 Jayhawk helicopter medically evacuating a man from the U.S. Navy supply support ship ‘NAWC 38’ 160 miles southeast of Cape Hatteras, North Carolina. On Friday, June 21, watchstanders in the 5th Coast Guard District Command Center in Portsmouth rec
Canadian shipbuilder Chantier Davie on Thursday unveiled the Project Resolve auxiliary oiler replenishment ship ‘Asterix’. Asterix is the first large naval ship to be built in Canada in over 20 years, according to the shipbuilder. Project Resolve, as the undertaking was dubbed, consists of convertin