UK’s Defence Secretary announced on Friday that first steel for the Royal Navy’s new Type 26 frigates would be cut in summer 2017. Michael Fallon made the announcement during a visit to Govan in Scotland and added that the deal was subject to final contract negotiations. Fallon also announced a £100
The U.S. Navy recently shared news of the Marines’ F-35B stealth fighter jet conducting trials aboard the amphibious assault ship USS America. A total of seven of the STOVL (short take-off vertical landing) variants of the Lockheed Martin-built jet are embarked on USS America for both developmental
Swedish defense contractor Saab has signed a memorandum of understanding (MoU) with Polish defense company Polska Grupa Zbrojeniowa (PGZ) under which the two companies will work together on the planning and delivery of Polish naval programs, including surface ship and submarine construction for the
The Royal Navy-hosted review of unmanned technologies which took place on the West Coast of Scotland concluded on October 20. The skies above the island of Benbecula, a remote Scottish outpost in the Outer Hebrides, have been clear and calm in October allowing several dozens of the world’s experts t
Qatar’s Coast Guard Command has taken delivery of the first in a series of 17 Ares-built composite hull boats. Powered and propelled by MTU high-speed engines and Rolls-Royce Kamewa waterjets, two Ares 75 and one Ares 110 Hercules, will be the first three boats of this programme to be delivered by t
A damp day across the Western Isles greeted the dozens of range staff, RN augmentees and Joint Warrior liaison teams who turned out before first light on the first official Unmanned Warrior flying day and headed for the brightly lit Range Control Building 12 miles south of Benbecula on the island of
A 4 billion euro (approx. $4.5B) contract for the construction of the German Navy’s new MKS 180 (Mehrzweckkampfschiff) ship has been delayed by six month, news agency Reuters has reported. The German defense ministry is postponing the contract to ensure high-quality standards are met, the report sai
BAE Systems announced Monday that it has signed a ten-and-a-half-year contract extension to provide combat systems integration services for Royal Navy’s in-service and future platforms. The contract includes, among others, Type 45 destroyers, the new Queen Elizabeth (QE) Class aircraft carriers, and
The UK Defence Equipment and Support (DE&S) Ships Operating Centre has awarded Frazer-Nash a contract for support on the delivery of ‘Safe to Operate’ Royal Navy equipment and platforms to the MOD. Frazer-Nash will be supported by BMT Cadence, BMT DSL and Survivability Consulting Limited on the unde
British Defence Secretary Michael Fallon attended the steel cutting ceremony for the first Successor submarine yesterday at BAE Systems’ Barrow-in-Furness site. The event marked the official start of the production of four nuclear-powered ballistic missile submarines which will replace Royal Navy’s
Norwegian Defence Materiel Agency (NDMA Naval Systems) has contracted Kongsberg Defence Systems to upgrade parts of the main weapon system of the Norwegian ULA-class submarines. Kongsberg is to carry out the work over the next four years under a contract that has a value of 220 million Norwegian Kro
Atlas Elektronik Finland has completed work on the Finnish Navy’s minelayer Pansio and delivered the vessel to the navy on October 3. Atlas Elektronik said the mid-life upgrade had been carried out together with Uki Workboat Oy (Uudenkaupungin Työvene Oy) as a subcontractor. According to the company
Work on upgrades to the Royal Navy’s Portsmouth-based Type 23 frigate, HMS Westminster, have been completed at Portsmouth Naval Base, UK. The multi-million pound refit on the 24-year-old Duke Class frigate has followed several busy years of deployments across the globe and includes upgrades to weapo
The United Kingdom is starting construction work on the next-generation nuclear-powered ballistic missile submarines. UK Defence Secretary Michael Fallon revealed this as he announced nearly £1.3 billion of funding was awarded to BAE Systems to start the ‘Delivery Phase 1’ of the Successor program.