BAE Systems has awarded propulsion systems specialist Rolls-Royce two contracts to supply low-noise propellers and mission bay handling technologies for the first three Royal Navy Type 26 frigates. The first Type 26 is currently under construction at the BAE Systems shipyard in Glasgow. The Rolls-Ro
German Navy’s 40-year-old tanker FGS Spessart was forced to abort its participation in a Norwegian-hosted exercise in the North Sea after experiencing electrical issues. Spessart was part of a multi-ship group maneuvering off Bergen, Norway, during two linked exercises – the Norwegian fleet exercise
Italian shipbuilder Fincantieri held a keel laying ceremony for the Italian Navy’s new landing helicopter dock (LHD) at its Castellammare di Stabia shipyard on February 20. Construction on the ship started with a steel cutting ceremony on July 12, 2017, and the delivery is expected for 2022. The shi
A fire broke out aboard the Russian Navy Udaloy-class destroyer Marshal Shaposhnikov in Vladivostok during welding works on February 15. According to Russian media, the fire broke out in one of the engine rooms of the destroyer. No one was injured in the incident and the fire did not cause damage to
The Spanish Navy’s four new S-80 submarines will cost EUR1.5 billion (approx. 1.85 b) more than it was initially expected, IHS Janes reported on Wednesday citing defense ministry sources. This latest estimate will be bring the total cost of the four air-independent propulsion submarines to EUR3.68 b
The Italian Navy shipyard in Augusta has completed a two-year modernization process and is now ready to offer extensive services for the navy fleet, including submarines. As a result of the upgrade, a Sauro-class submarine is dry docked in Augusta for an overhaul for the first time in 14 years. The
HMS Forth, the first of five second-batch River-class offshore patrol vessels to be built for the Royal Navy, was officially received by the UK defense ministry on Thursday. Forth will be commissioned into the Royal Navy fleet at her home port of Portsmouth Naval Base later this year. UK defense pro
Russia’s defense industry agency Rosoboronexport will work with the country’s largest shipbuilding company in 2018 to boost worldwide export prospects for what the agency termed as small and ultra-small submarines. Rosoboronexport said this focus was in response to a growing interest for these vesse
The Republic of Singapore has started construction of additional two Type 218SG, air-independent propulsion (AIP) submarines, the country’s defense ministry announced. According to the defense ministry, the steel cutting ceremony for the third and fourth boats in the class took place on January 12.
The French defense procurement agency DGA (Direction générale de l’armement) has awarded the Naval Group and Airbus Helicopters consortium a contract to develop a rotary wing unmanned aerial vehicle (UAV) demonstrator for the French Navy. According to a Naval Group announcement, the contract covers
Royal Navy’s Type 45 destroyer HMS Duncan got underway from naval base Portsmouth on December 8 to start her deployment to NATO’s Standing Maritime Group 2 (SNMG2) and the Royal Navy’s operation Kipion tasking. HMS Duncan is the first Royal Navy destroyer to deploy in 2018. The remaining five destro
Dutch shipbuilder Damen has contracted Bakker Sliedrecht to deliver its electrical auxiliary propulsion system for the Mexican Navy’s SIGMA 10514 long-range patrol vessel. The vessel is currently under construction at Damen Schelde Naval Shipbuilding (DSNS) in Vlissingen, the Netherlands, after the
Finnish boat builder Boomeranger Boats will be delivering its rigid hull inflatable boats to the United Arab Emirates and the Indian Navy after signing the contracts earlier this year. Announcing the contracts, the company said it is set to deliver a total of 34 special operations boats to the Unite
On November 27, 2017, Fincantieri delivered Offshore Patrol Vessel P61 to the Armed Forces of Malta, following upgrading activities carried out at the Group’s drydocking facility within the Port of Genoa. The aim of the works, which lasted about 6 months, was to improve the reaction capability of th