
Northrop Grumman has started the production of the first E-2D Advanced Hawkeye for the French Navy at the company’s St. Augustine manufacturing facility.

Germany’s Port of Hamburg has received its first hybrid police boat which is expected to help it achieve the goal of becoming climate-neutral by 2040.

Finnish shipbuilding company Meyer Turku has started the construction of Finnish Border Guard’s second patrol vessel.

The first steel has been cut for the UK’s newest warship, the Type 26 frigate HMS Sheffield, at BAE Systems’ Govan shipyard in Glasgow.

Spanish shipbuilder Navantia has completed the installation of the air-independent propulsion (AIP) system equipment, based on hydrogen technology, onto the Spanish Navy’s S-80 submarine.

A crewless boat has been driven around the Solent and remotely controlled from a Royal Navy vessel in a first in UK waters.

French shipbuilding company Naval Group has delivered the third Barracuda-class submarine to the French Navy.

Work has started on HMS Scott to extend the vessel’s operational life into the early 2030s.

Leonardo has signed a contract with the Italian Coast Guard for the supply of an ATR42-600 Maritime Patrol (MP) aircraft.

Israeli defense technology company RAFAEL Advanced Defense Systems has secured a contract to supply vessels of a NATO country with the latest generation of its Digital Shark electronic countermeasure (ECM) systems.

Babcock International has awarded a recycling contract to KDC Veolia Decommissioning Services (KDCV) for nuclear-powered submarine Swiftsure.

Navantia, Fincantieri, and Naval Group, together with Naviris, have signed the initial consortium agreement which aims to start the second phase (Call 2) of the Modular and Multirole Patrol Corvette (MMPC) Project.

Rohde & Schwarz has been commissioned to supply and integrate systems for communications and radar electronic support measures (C-ESM/R-ESM) for the German Navy’s F124 Sachsen-class frigates.

The Fleet Solid Support Ships (FSS) program for the Royal Fleet Auxiliary has completed the preliminary design review (PDR), marking its first major milestone.