Naval Today
  • Vessels
  • Equipment & Technology
  • Operations
  • Capital Investments
  • Authorities
  • More news
JobsNewsletter
Naval Today logo

Your trusted source for naval and maritime news, part of the Navingo network.

Topics
  • Equipment & technology
  • Industry
  • Vessels
  • Operations
  • Training & Education
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Surface Vessels›Sea Trials of New Italian Carlo Bergamini-Class Frigate Starts
Surface Vessels

October 20, 2011 · about 14 years ago

Sea Trials of New Italian Carlo Bergamini-Class Frigate Starts

Sea trials of new Italian Carlo Bergamini-class frigate (FREMM project) have been started, reported Italian Navy. The new frigate is designed for antiaircraft/antiship/antisubmarine warfare, delivering strikes upon enemy ships at sea and at basing sites, fire support of landing operations, destructi

1 minutes read
  • LinkedIn
  • X
  • Email

Sea trials of new Italian Carlo Bergamini-class frigate (FREMM project) have been started, reported Italian Navy. The new frigate is designed for antiaircraft/antiship/antisubmarine warfare, delivering strikes upon enemy ships at sea and at basing sites, fire support of landing operations, destruction of ground targets, and other tasks.

FREMM-class frigates are built for Italian Navy in antisubmarine and attack variants.

Externally, a FREMM frigate resembles project HORIZON destroyer. The difference is separated funnel and mainmast. The ship has flush-decked steel hull and one monoblock bulkhead. Stern part of the bulkhead and smoke funnel are made of fiberglass. Lateral surfaces of the hull and bulkhead are 10-degree inclined. A number of construction solutions were introduced into the project in order to improve vibroacoustic characteristics and protect from mass destruction weapons. Stealth technology was implemented as well.

Laminated composite materials and special coatings were used in the bulkhead construction.

Instead of 10 frigates planned to be built till 2020, it was ordered 6; two of them has been already laid down. Construction of lead frigate Carlo Bergamini was started in 2008 at Fincantieri Riva Trigoso shipyard; the ship is to be delivered in 2011. The second frigate was keel-laid in 2009, delivery term is 2012. Cost of a serial ship is about EUR 500 mln.

[mappress] Source: rusnavy, October 21, 2011

Reach the Naval Today industry in one go!

Naval Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Naval Today on:

Filed under

Surface VesselsVesselsCapital InvestmentsOperationsTraining & EducationAmphibious & Support Ships

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1AUKUS partners test next-gen underwater surveillance tech
  2. 2Australia's Bisalloy to supply steel for US Navy Virginia-class submarines
  3. 3Canada and UK firms join forces to expand autonomous vessel operations in North America
  4. 4Australia invests another $4.6 billion in AUKUS submarine construction yard

Related articles

HydroSurv
USV

Canada and UK firms join forces to expand autonomous vessel operations in North America

20 hours ago

US Navy
Amphibious & Support Ships

US Navy's final expeditionary sea base wraps up acceptance trials

1 day ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

HydroSurv
USV

Canada and UK firms join forces to expand autonomous vessel operations in North America

20 hours ago
US Navy
Amphibious & Support Ships

US Navy's final expeditionary sea base wraps up acceptance trials

1 day ago