MQ-8C Fire Scout, the US Navy’s new unmanned helicopter, has reached initial operational capability (IOC) after some six years of flight trials. The navy declared IOC on June 28, after the MQ-8C clocked in over 1,500 flight hours with more than 700 sorties. The sea-based, vertical lift unmanned syst
Polish shipbuilder Remontowa Shipbuilding hosted a naming and launching ceremony for the Polish Navy’s third B860 tug on July 8. The vessel was named Mieszko and is part of a six-unit order from 2017. Three tugs would be supplied to the 3rd Ship Flotilla and three to the 8th Coastal Defense Flotilla
Senior leaders from the navies of Australia and Japan met in Canberra for a series of engagements as the countries seek to expand their roles in the Southwest Pacific. The Royal Australian Navy and Japan Maritime Self Defence Force (JMSDF) have been constantly developing their cooperation since they
US Navy’s Independence-variant littoral combat ship USS Montgomery (LCS 8) arrived at Singapore’s Changi Naval Base on July 6, becoming the first LCS to deploy to Singapore since late 2017. Montgomery’s arrival is part of a rotational deployment to the Indo-Pacific area of operations and is the four
The UK Ministry of Defence has signed an £85 million contract with engineering company Rolls-Royce to maintain the engines of the Royal Navy’s Type-23 frigate fleet. The contract includes a comprehensive support package to Spey gas turbines, including the overhaul of engines, provision of spares, as
The US Navy’s Ronald Reagan Strike Group has arrived in Brisbane, Australia, for a regularly scheduled port visit. The aircraft carrier USS Ronald Reagan (CVN 76) and the Ticonderoga-class guided-missile cruiser USS Chancellorsville (CG 62) pulled into Brisbane July 5, while the Arleigh Burke Class
The Romanian authorities have selected French Naval Group and its Romanian partner Santierul Naval Constanta (SNC) for the program to build four new Gowind multi-mission corvettes. In addition, Naval Group and SNC will modernize the T22 frigates and create a maintenance center and a training center.
MacGregor, part of Cargotec, has been selected to supply repeat packages of deck machinery equipment for two new US Naval Sea Systems Command (NAVSEA) towing, salvage and rescue ships (T-ATS). The ships are currently under construction at Gulf Island Shipyards in Houma, Louisiana, US. The equipment
KBR has been awarded a $45.9M task order to provide logistics information technology services to the US Naval Air Systems Command’s (NAVAIR) Logistics and Maintenance Information Systems and Technology Division. As informed, KBR received this cost-plus-fixed-fee task order under the Department of De
Naval Surface Warfare Center, Port Hueneme Division (NSWC PHD) is leading mobile logistics and the development of emergent repair concept of operations for the NAVSEA Program Executive Offices, Integrated Warfare Systems, Wartime Acquisition Scalable Plan (WASP) tabletop exercise, which kicked off a
HMAS Newcastle (FFG 06), the Royal Australian Navy’s last locally built Adelaide class guided missile frigate, has been decommissioned in Sydney. The decomissioning ceremony for the ship was held at Fleet Base East on June 30, 2019, the navy said. The event was a celebration of Newcastle’s dedicated
Britain’s maritime union RMT confirmed that a program of industrial action involving nearly 700 workers at the Royal Fleet Auxiliary (RFA) – the Royal Navy supply lifeline – in a fight for pay justice goes ahead today. RMT has criticized the Tory Government for interfering in the pay negotiations, f
The US Navy’s Arleigh Burke-class guided-missile destroyer USS Stethem (DDG 63) returned to the US 3rd Fleet area of operations on June 30, following 14 years of forward-deployed service in the Indo-Pacific region operating from Japan. The destroyer is en route to San Diego, where she will be homepo
The construction of the digitally-enabled shipyard infrastructure at Osborne South is on track for completion by March 2020, ahead of the commencement of production prototyping on the $35 billion Hunter-class frigate program, Australian defense ministers said. Australian Minister for Defence, Senato