More than 20 participants, both military and civilian, attended 7th Fleet Maintenance and Overseas Sustainment Summit hosted on board the submarine tender USS Frank Cable (AS 40) in Santa Rita, Guam, Aug. 11 through Aug. 13. Opened by remarks from Vice Adm. Robert L. Thomas Jr., commander, U.S. 7t
U. S. 7th Fleet flagship USS Blue Ridge (LCC 19) hosted two junior officers from the Royal Australian Navy (RAN) to offer them in-depth shipboard training, July 28 to Aug. 14, promoting cooperation between the U.S and Australia. Sub Lt. Dionette Wilson and Sub Lt. James Chinner were selected by th
BAE Systems San Diego Ship Repair, San Diego, California, is being awarded a $7,3 million modification to a previously awarded cost-plus-award-fee contract for the USS Ardent (MCM 12) fiscal 2014 selected restricted availability (SRA). A SRA includes planning and execution of depot-level maintenan
Standing NATO Maritime Group TWO (SNMG2) arrived in Mayport, Florida for a scheduled port visit in advance of Fleet Exercises (FLEETEX) on Thursday, 14 August 2014. FLEETEX are multi-warfare naval exercises designed to promote force integration and test multiple war fighting skill sets. Ships from
BAE Systems San Diego Ship Repair, San Diego, California, is being awarded a $13,6 million modification to a previously awarded cost-plus-award-fee/incentive-fee contract for the USS Howard (DDG 83) fiscal 2014 selected restricted availability (SRA). A SRA includes planning and execution of depot-
Senior leaders from the U.S. and Republic of Korea navies signed a charter August 16 pledging to increase cooperation in future anti-submarine warfare training. The charter was signed during a special ceremony hosted by Vice Adm. Jung, Ho-Sup, commander of the Republic of Korea Fleet. Vice Adm. Ro
US Navy Munitions Command East Asia Division (NMC EAD) held a change of command ceremony on Aug. 14 aboard the Battleship Missouri Memorial, Joint Base Pearl Harbor-Hickam (JBPHH). Capt. Edward M. Galvin relieved Capt. Michael J. Singleton as commanding officer during the official ceremony. During
As the amphibious assault ship USS Peleliu (LHA 5) deploys to the 7th Fleet area of responsibility (AOR), the ship gained a few ship riders to better educate the crew about this culturally diverse region. Lt. Daniel Bradshaw, foreign area officer (FAO) and administrative officer for the Regional S
The Boeing Co., Seattle, Washington, is being awarded a $295,6 million advance acquisition contract for the procurement of long-lead items for the manufacture and delivery of 12 Lot II Full Rate Production P-8A aircraft for the U.S. Navy (8) and the government of Australia (4). Work will be perfor
The Sea Warrior Program (PEO EIS PMW 240) awarded a $96 million indefinite-delivery/indefinite-quantity contract June 11 to SRA International, Inc. for the support, sustainment, upgrades, and modernization of personnel systems under the US Navy’s Integrated Personnel and Pay System (IPPS) strategy.
Huntington Ingalls Industries’ AMSEC LLC subsidiary has been awarded two contracts in support of the United States Navy. Naval Sea Systems Command in Washington, D.C., awarded a contract to AMSEC for technical and logistical support services, as well as material kitting services, for U.S. Navy LCC
The command of the Los Angeles-class fast attack submarine USS Asheville (SSN 758) welcomed a new commander in a time-honored change of command ceremony Aug. 12, atop the historic battleship USS Missouri, the “Mighty Mo.” Cmdr. Paul Pampuro relieved Cmdr. Douglas Bradley as commanding officer. In
Coastal Patrol (PC) ships USS Hurricane (PC 3) and USS Monsoon (PC 4) completed their arrival to Bahrain the second week of August. Hurricane and Monsoon are the final two of 10 ships that are part of a realignment plan to increase the PC presence in the U.S. 5th Fleet area of responsibility (AOR)
The Huntington Ingalls Industries (HII) shipyard in Newport News, Virginia is all abuzz as below deck-testing of the US Navy’s newest aircraft launch system begins aboard USS Gerald R. Ford (CVN 78). Following months of large-scale hardware deliveries containing critical components of the Electrom