Naval Surface Warfare Center, Port Hueneme Division (NSWC PHD) is leading mobile logistics and the development of emergent repair concept of operations for the NAVSEA Program Executive Offices, Integrated Warfare Systems, Wartime Acquisition Scalable Plan (WASP) tabletop exercise, which kicked off a
HMAS Newcastle (FFG 06), the Royal Australian Navy’s last locally built Adelaide class guided missile frigate, has been decommissioned in Sydney. The decomissioning ceremony for the ship was held at Fleet Base East on June 30, 2019, the navy said. The event was a celebration of Newcastle’s dedicated
The US Navy’s Arleigh Burke-class guided-missile destroyer USS Stethem (DDG 63) returned to the US 3rd Fleet area of operations on June 30, following 14 years of forward-deployed service in the Indo-Pacific region operating from Japan. The destroyer is en route to San Diego, where she will be homepo
The construction of the digitally-enabled shipyard infrastructure at Osborne South is on track for completion by March 2020, ahead of the commencement of production prototyping on the $35 billion Hunter-class frigate program, Australian defense ministers said. Australian Minister for Defence, Senato
The US Navy’s 30th Naval Construction Regiment (30 NCR) and the Republic of Korea (ROK) Naval Mobile Construction Squadron (NMCRON) 59 have signed a memorandum of understanding (MOU) for mutual exchange and cooperation. Inked in Santa Rita, Guam, on June 26, the agreement is expected to strengthen n
HMAS Success, the longest serving ship in Royal Australian Navy’s fleet, has completed her service to the nation and was decommissioned at her homeport at Sydney’s Garden Island on June 29. Success – dubbed the ‘Battle Tanker’ – has been a vital part of the navy’s capability over the past 33 years.
The US Senator Maria Cantwell (D-WA) has secured an amendment to provide for real-time monitoring of noise from all flights and training of EA-18G Growlers associated with Naval Air Station Whidbey Island. The amendment has been secured as part of the Senate’s final passage of the National Defense A
The ineffective crew training about the use of onboard electronic chart display and information system (ECDIS) might have led to the grounding of the Australian Border Force cutter Roebuck Bay, a new investigation shows. In September 2017, the ABFC Roebuck Bay grounded on Henry Reef in the Great Bar
The Canadian Coast Guard (CCG) has accepted delivery of the first new large vessel built under the National Shipbuilding Strategy (NSS). The first offshore fisheries science vessel (OFSV), CCGS Sir John Franklin, was built by Seaspan’s Vancouver Shipyards in Canada. “On behalf of the Canadian Coast
Australian Defense Force has officially handed over a new Guardian-class patrol boat (GPB) to the Kingdom of Tonga. The handover ceremony took place at Austal Shipyards in Henderson, Western Australia, on June 21, 2019. This is the third of 21 Guardian-class ships that Austal has designed and built
An updated estimate of the Canadian Surface Combatant (CSC) program indicates that the Canadian government is poised to pay C$8 billion more than initially expected to acquire a fleet of 15 new frigates. According to the government’s new budget officer report, the total cost of the CSC program is C$
US Secretary of the Navy (SECNAV) Richard V. Spencer has announced the newest towing, salvage, and rescue ship will be named Cherokee Nation. This is the fifth US ship to be named in honor of the Cherokee people. “It is my privilege to announce that the many Cherokee Nation citizens who’ve served th
US Navy’s Norfolk Naval Shipyard (NNSY) dedicated its new submarine maintenance facility on June 14. This marked the next step in the NNSY’s realization of the Shipyard Infrastructure Optimization Plan that will enhance the ability of the four public shipyards to meet the mission of delivering ships
Royal Australian Navy Anzac-class frigate HMAS Arunta officially rejoined the fleet after completing her Anzac Midlife Capability Assurance Program (AMCAP) upgrade. Arunta is the first ship to undergo the program which provides significant improvements to the ship’s key sensor and communications sys