The Royal Navy’s sixth and final Type 45 destroyer – HMS Duncan -has reached a major milestone before she arrives in Portsmouth for the first time later this year. The anti-air warfare destroyer now has a full complement of crew members after 80 sailors assembled in Portsmouth Naval Base to official
A state government project management unit has issued international tender for procurement of High Speed Sea Going Vessel for Coastal Patrolling and Related Services. A high speed sea going vessel for coastal patrolling & surveillance against intrusion by fishing boats in the territorial waters alon
The first part of Operation Trident Arch, Jan. 7-14, is underway at Naval Weapons Stations Yorktown-Cheatham Annex. Trident Arch is a Navy Expeditionary Medical Support Command (NEMSCOM) operation that rotates Fleet Hospitals and Expeditionary Medical Facilities from prepositioned storage sites worl
Pilots have been using a simulator in Lancashire to help prepare them for landing on the Royal Navy’s new Queen Elizabeth Class carriers. RAF and Royal Navy personnel have been training with the Flight Control Office – or Flyco – of the carrier HMS Queen Elizabeth at the BAE Systems simulator at War
Under a newly exercised option for the AN/SLQ-25C system contract, Boeing subsidiary Argon ST will continue to supply U.S. Navy surface ships with countermeasures that lure torpedoes away by mimicking a vessel’s propulsion system. The $8 million option covers production and delivery of eight new AN/
President Barack Obama signed the $633 billion fiscal 2013 National Defense Authorization Act into law yesterday. The legislation, which cleared Congress last month, authorizes the department to act in any number of instances. “There are certain things that cannot be done without [the authorization
Analysts forecast the Global Military Shipbuilding and Submarines Market to grow at a CAGR of 2.93 percent over the period 2011-2015. One of the key factors contributing to this market growth is the increasing share of defense budget. The Global Military Shipbuilding and Submarines market has also b
The flight deck shakes, an arresting wire is caught and twin turbojet engines roar as an EA-6B Prowler from the “Wizards” of Electronic Attack Squadron (VAQ) 133 lands on the Nimitz-class aircraft carrier USS John C. Stennis (CVN 74) during its current deployment in the U.S. 5th Fleet area of respon
1. January US Navy to Deploy Third Carrier Group to Persian Gulf The US will dispatch another carrier strike group led by USS Enterprise to the Persian Gulf in March 2012, reported US Navy on Jan 25. The carrier group based in Norfolk, VA will also include a guided missile cruiser and three [&hell
General Dynamics Bath Iron Works, Bath, Maine, was awarded a $13,499,140 order under Basic Ordering Agreement (N00024-12-G-4330) for the accomplishment of the planning yard services in support of littoral combat ships LCS-2 and LCS-4. General Dynamics Bath Iron Works will execute planning yard funct
Boeing on Dec. 19 made an on-site delivery of the first P-8I aircraft to the Indian Navy in Seattle, in accordance with the contract. India will receive this aircraft and two more of its eight contracted P-8Is in 2013. The program is progressing on schedule as Boeing assembles the fourth and fifth P
The U.S. Navy has awarded General Dynamics Bath Iron Works, a subsidiary of General Dynamics, two contracts in support of the DDG 51 Arleigh Burke-class guided missile destroyer program. Bath Iron Works is the lead shipyard and design agent for the class. The first contract, valued at $28.3 million,
HMS Penzance has arrived in Rosyth – the latest of the Sandown-class flotilla of minehunters to receive a multi-million-pound overhaul. The ship follows her recently-revamped sister Grimsby into the ship shed on the Forth, where she’ll spend five months receiving upgrades, improvements and a general
The Royal Navy frigate HMS Portland arrived at its base-port of Plymouth following a £27 million-pound refit. The refit, in Rosyth, Scotland, took 50 weeks and was carried out by Babcock at the Fife dockyard. With more than 260,000 man-hours invested in the almost year-long project, the 133-metre HM