Navantia received, on 15th November, the first Algerian Navy ship for its repairing and modernization. The contract for the reparation and modernization of the two units came in force last 25th July. With the arrival of this ship to Reparaciones Fene-Ferrol facilities, Navantia Reparaciones will sta
Following the announcement on 21 September 2010 regarding the disputed Offshore Patrol Vessel contract with the Government of the Republic of Trinidad and Tobago (GORTT), BAE Systems and GORTT have reached agreement on a settlement. The three Offshore Patrol Vessels that were the subject of the GORT
Four new Royal Fleet Auxiliary tankers which will be bought as part of the Military Afloat Reach and Sustainability (MARS) programme will be called the Tide class. The 37,000 tonne ships will come into service from 2016 to replace the RFA’s single hulled tankers and will maintain the Royal Navy’s de
The final hull section of the Queen Elizabeth aircraft carrier has arrived at Rosyth dockyard, according to the Scotsman.com. The Lower Block 04 left BAE System’s yard on the Clyde last Sunday. For more details visit the link. “LB04 is the largest section of HMS Queen Elizabeth, and the final part o
USS San Jacinto (CG 56) entered dry dock at the BAE Systems Ship Repair facility in Mayport, Fla., Nov. 1, to begin repairs following the ship’s collision with USS Montpelier (SSN 765) in mid-October. BAE Systems was awarded an initial amount of $9,691,713 to begin the work as part of the company’s
The Boeing Co. has received a $16.7 million contract for the production of gigabit Ethernet data multiplex systems for the DDG modernization program, new ship construction, Aegis Ashore Systems, additional hardware and the repair of units during installation and checkout. Gigabit Ethernet Data Multi
Bae Systems, global defense, aerospace and security company, has announced on its official twitter account that Lower block 04 of the Queen Elizabeth aircraft carrier has departed Clyde. “And she’s off….Lower Block 04 leaves the Clyde to embark on her delivery voyage to Rosyth ”, Bae Systems wrote.
BAE Systems Company signed a contract worth 315 million pounds with the UK Ministry of Defence for ongoing design work for the replacement to the Royal Navy’s Vanguard class submarines. BAE Systems Maritime – Submarines Managing Director John Hudson said: “The design of a nuclear-powered submarine i
Having finished repair and modernization at Zvezdochka Ship Repair Center (Severodvinsk, Russia), Indian diesel submarine… [mappress] Source: Russian Navy, October 31, 2012; Image: Flot
The Defence Secretary has announced an additional £350M worth of funding for the next stage of design work for Successor, the future generation of UK nuclear-armed submarines. This investment will sustain 1,200 UK jobs and makes clear the Government’s firm commitment to maintaining continuous at sea
The U.S. Navy has awarded General Dynamics Electric Boat a $17.5 million contract modification to perform reactor-plant planning yard services for nuclear submarines and support yard services for moored training ships. Electric Boat is a wholly owned subsidiary of General Dynamics. The contract bein
Vice Admiral David Steel, CBE, Chief Of Naval Personnel & Training and Second Sea Lord officially opened the new Close Range Training Section, HMS Collingwood on 19 October 2012. This was the Admiral’s first official act since becoming Second Sea Lord, and at the opening ceremony he said, “It gives
Northrop Grumman Corporation has provided the advanced communication, sensor and navigation systems installed on the first of two new offshore support vessels (OSVs) being procured by the U.S. Naval Sea Systems Command (NAVSEA) on behalf of the Iraqi navy. NAVSEA accepted delivery of the first 60-me
Raytheon Company’s Rolling Airframe Missile Block 2 successfully completed its third guided test vehicle flight, further demonstrating the system’s upgraded kinematic performance, guidance system and airframe capabilities. The test also verified the use of RAM production-representative hardware. Des