BMT Nigel Gee, a subsidiary of BMT Group, has announced its latest collaboration to deliver naval architecture and engineering expertise to premier Dutch custom yacht builder, Oceanco following completion of the 110m PA107 design. The 110m DP001 project which has been the main focus of work in 2011
IFS Defence has been awarded a prestigious Certificate of Commendation by the Chief of Defence Material (CDM) for its work with the UK Royal Navy. The commendation was given in recognition of the IFS Defence team’s outstanding achievement in developing and delivering a coherent support solution whil
HMCS Winnipeg is preparing for a Mid-Life Refit (MLR). The ship will receive extensive work to improve capability against modern threats as it reaches its mid-life period. The 12 Canadian-built HALIFAX class multi-role patrol frigates are considered the backbone of the Canadian Navy. They can deplo
Kongsberg Maritime has been selected by BAE and the Australian Defence Force (ADF) to provide a custom engine room simulator for the training of engineers aboard Royal Australian Navy (RAN) Canberra Class Landing Helicopter Dock (LHD) vessels. The new LHD Engineering System Trainer (LEST) will sign
Preparations for the assembly of the Queen Elizabeth Class aircraft carriers got off to a flying start today as Goliath, one of Europe’s largest cranes, swung into action under the watchful eye of Minister for Defence Equipment, Support and Technology Peter Luff. The event, held at Babcock’s shipyar
In 2012-2014 Russian government plans to bring RUR 9.8 bln in authorized capital of JSC United Shipbuilding Corporation. Substantial part of this sum will be appropriated to increase capital stocks of Severodvinsk shipyards Sevmash and Zvezdochka. As was said in the draft federal law “On Federal Bud
HMS Lancaster’s refit reached a key milestone today as the dry dock housing the Ship was flooded for the first time since September 2010. Since entering upkeep in September 2010, HMS Lancaster has received extensive work to her equipment and systems, with both shafts being replaced, a transom flap f
BAE Systems San Diego Ship Repair, Inc., San Diego, Calif., is being awarded an $18,389,065 modification to previously awarded contract (N00024-08-C-2300) for the accomplishment of the post-shakedown availability (PSA) for the DDG 51-class guided-missile destroyers USS William P. Lawrence (DDG 110)
Delegation of Indian Navy headed by director of ship building and procurement department Vice Admiral N. N. Kumar arrived at Sevmash shipyard for inspection. Today, Vice Admiral Kumar accompanied by president of JSC United Shipbuilding Corporation (USC) Roman Trotsenko, Sevmash‘s Chief Engineer Alex
JSC Severnaya Verf shipyard received tens of billions rubles as government guarantee for state defense order execution. Corresponding governmental decree No. 1575 was signed by Russian Prime Minister Vladimir Putin on Sept 8, 2011. According to the document, the guarantee is extended up to the end o
BAE Systems has been engaged by the Commonwealth for the development and delivery of training for the Royal Australian Navy’s (RAN) Landing Helicopter Dock (LHD) ships. The training will rely heavily on simulation and virtual scenarios using the latest technology, including avatars. BAE Systems Dire
The Boeing Co., St. Louis, Mo., is being awarded a $7,671,795 modification to a previously awarded firm-fixed-price contract for the procurement of F/A-18 E/F and EA-18G aircraft armament equipment, to include: 174 station control units; 22 aerial refueling store (ARS) suspension lugs; 12 centerline
BAE Systems Norfolk Ship Repair, Norfolk, Va., is being awarded a $17,062,566 modification to previously awarded contract (N00024-10-C-4308) for the USS Mason (DDG 87) fiscal 2012 drydocking selected restricted availability (DSRA). A DSRA includes the planning and execution of depot-level maintenanc
The U. S. Navy has awarded General Dynamics Bath Iron Works, a subsidiary of General Dynamics , a $1.8 billion contract for the construction of DDG 1001 and DDG 1002, the next two ships in the Zumwalt-class program. DDG 1001 is scheduled to be delivered in December 2015 and DDG 1002 is scheduled to