Contracts
Russian Court Confirms Sentence on Admiral Gorshkov Overhaul
Arkhangelsk Regional Court affirmed the inferior decision to impose a RUR 100,000 fine on director of the company provided repair works for aircraft-carrying cruiser Admiral Gorshkov, reported Arkhangelsk Procuracy press service on Sept 6. According to the procuracy, JSC SMK Alternativa was conducti
USA: Siemens PLM Software, BAE Systems Ink Teamcenter Software Contract
Siemens PLM Software, a business unit of the Siemens Industry Automation Division and a leading global provider of product lifecycle management (PLM) software and services, today announced that BAE Systems Submarine Solutions (BAE Systems), a world leading design and manufacturer of submarines, sig
Indian Navy’s Black Panther Squadron to Finish Commissioning of MiG-29K/KUB in Mid-2012
Indian Navy’s Black Panther squadron will finish commissioning of the first parcel of Russian fighters MiG-29K/KUB in the middle of 2012. In prospect, the squadron will obtain the number of “303”. According to Press Trust of India referring to the squadron commander, delivery of the last 16 fighters
Norway to Upgrade P-3C Aircrafts
The Defense Security Cooperation Agency notified Congress today of a possible Foreign Military Sale to the Government of Norway for the inst… (asdnews) [mappress] Source: asdnews, September 6, 2011;
USS Pasadena to Undergo Extended Overhaul
Rear Adm. Rick Breckenridge, Commander Submarine Group Two welcomed the crew of the Los Angeles-class submarine USS Pasadena (SSN 752) who travelled more than 7,000 miles from Pearl Harbor, Hawaii to begin their extended maintenance overhaul at Portsmouth Naval Shipyard, Sept. 2. Breckenridge and th
UK: Antarctic Survey Vessel HMS Protector Prepares for Maiden Mission
Looking more like one of Her Majesty’s Ships by the day – and less like an oil rig support vessel – is new Antarctic survey vessel HMS Protector, which has spent the summer being readied for her inaugural deployment. The Portsmouth-based ship now boasts miniguns (Gatling guns) and General Purpose Ma
USA: Arleigh Burke-Class Guided-Missile Destroyer Begins Maiden Voyage
The newest Arleigh Burke-class guided-missile destroyer, the future USS Spruance (DDG 111), sailed away from the Bath Iron Works shipyard in Bath, Maine Sept. 1 on its maiden voyage to her commissioning site in Key West, Fla. before heading to her eventual homeport of San Diego, Calif. This mileston
USA: Boeing Bags USD 16.88 Million Aircraft Contract
The Boeing Co., St. Louis, Mo., is being awarded a $16,881,855 modification to a previously awarded firm-fixed-price, fixed-price -incentive contract (N00019-09-C-0019) for non-recurring and recurring engineering in support of Engineering Change Proposal 6213R2, “Trailing Edge Flap Honeycomb Redesig
USA: Lockheed Martin Gets USD 49.95 Million TSS Contract
Lockheed Martin Corp., Missiles and Fire Control, Orlando, Fla., is being awarded a $49,950,000 firm-fixed-price contract for procurement of 18 AN/AAQ-30 target sight systems (TSS) that will be integrated into the AH-1Z Cobra attack helicopter. This integration is part of the USMC H-1 upgrade progra
Russia: Khabarovsk Shipyard Launches Sea-Going Ice-Class Tug for PF
New sea-going ice-class tug was launched at Khabarovsk Shipyard on Aug 26. The solemn launching ceremony was attended by the shipyard’s directors, representatives of Khabarovsk Territory Government, Russian Navy, and Khabarovsk eparchy. Deputy minister of regional industry and transport Sergei Ivash
UK: HMS Dragon Leaves BAE Systems Clyde Yard
Dragon, the fourth Type 45 anti-air warfare destroyer built by BAE Systems for the Royal Navy, has set sail from the Clyde for the final time today. Dragon set off from the company’s Scotstoun yard this morning, with a combined BAE Systems and Royal Navy crew, as she embarked on the journey to her
Norfolk Naval Shipyard Completes Installation of Main Mast Aboard USS Harry S. Truman (CVN 75)
Norfolk Naval Shipyard completed the installation of the main mast aboard USS Harry S. Truman (CVN 75) Aug. 20, marking the latest milestone in the ship’s 13-month dry docking planned incremental availability. The 112,000-pound mast – standing 10 feet taller and 23,000 pounds heavier than the mast r
UK: Royal Navy Warship HMS Dragon Roars Home
Dragon, the fourth Type 45 anti-air warfare destroyer built by BAE Systems for the Royal Navy, has set sail from the Clyde for the final time today. Dragon set off from the company’s Scotstoun yard this morning, with a combined BAE Systems and Royal Navy crew, as she embarked on the journey to her [
USA: BAE Systems Bags USD 14.54 Million USS Preble Contract
BAE Systems San Diego Ship Repair, Inc., San Diego, Calif., is being awarded a $14,545,851 modification to a previously awarded cost-plus-award-fee contract (N00024-07-C-4407) to definitize the USS Preble (DDG 88) fiscal 2011 dry-dock selected restricted availability (DSRA). A DSRA includes the pla