Bath Iron Works Gets USS Zumwalt’s Propellers Rolls-Royce has delivered the twin fixed pitch propellers to Bath Iron Works for installation on the US Navy’s most modern surface combatant, the future USS Zumwalt, the first ship of the DDG 1000 multi-mission destroyer class. Portsmouth Naval Base Prep
Rolls-Royce has delivered the twin fixed pitch propellers to Bath Iron Works for installation on the US Navy’s most modern surface combatant, the future USS Zumwalt, the first ship of the DDG 1000 multi-mission destroyer class. The provision of the twin fixed pitch propellers marks the completion of
The HonourableEd Holder, Australian Minister of State (Science and Technology) and Susan Truppe, Member of Parliament for London North Centre and Parliamentary Secretary for Status of Women, on behalf of the Honourable Julian Fantino, Associate Minister of National Defence, on July 27th announced a
OceanWorks International has completed system upgrades to the third Italian Navy’s HARDSUIT™ Atmospheric Diving System (ADS), designed and delivered by OceanWorks. The conclusion of the work on the third ADS marks the completion of a major survey and upgrade of the Italian Navy’s ADS fleet to the Qu
General Dynamics received a $20 million contract modification from the U.S. Navy to continue modernizing the AN/BYG-1 Weapons Control System (WCS) Technology Insertion and Advanced Processing Build software for U. S. Navy and Royal Australian Navy submarines. The AN/BYG-1 software analyzes and track
BAE Systems San Diego Ship Repair is being awarded an undefinitized contract action with a not-to-exceed amount of $38,3 million to previously awarded contract for USS Bunker Hill (CG-52) fiscal 2015 Selected Restricted Availability (SRA). An SRA includes the planning and execution of depot-level ma
A ceremony at the Huntington Ingalls Industries (HII) shipyard celebrated the start of fabrication of the future USS Delbert D. Black (DDG 119), July 21. The future USS Delbert D. Black honors the first Master Chief Petty Officer of the Navy (MCPON). Black, a 30-year veteran, rose from the ranks of
BAE Systems Norfolk Ship Repair, Norfolk, Virginia, is being awarded a $38,6 million modification to a previously awarded contract for USS Leyte Gulf (CG-55) fiscal 2015 extended docking selected restricted availability. An extended docking selected restricted availability includes the planning and
BMT Group Ltd, the international design, engineering and risk management consultancy, will showcase its capabilities and designs across the naval, land and air domains at the DSEI event, to be held at London’s ExCeL in September. Delegates visiting the show will have the opportunity to engage with t
Huntington Ingalls Industries’ Newport News Shipbuilding division was awarded a $106 million contract to provide engineering and industrial support on U.S. Navy submarines, special mission submersibles, submarine support facilities and related programs. If all options are exercised, the total value
Over the weekend, NATO Allied Maritime Command’s Chief of Staff, Rear Admiral Giorgio Lazio met with Bulgarian and Romanian military leadership in the framework of MARCOM periodic engagements with the maritime forces of the Allied nations bordering the Black Sea, and to contribute in profiling NATO’
Australian Navy’s HMAS Huon departed HMAS Waterhen in Sydney recently to head north on a three-month deployment in support of border protection duties as part of Operation RESOLUTE. Having recently completed a Tactical Data System Upgrade, trials and Mine Warfare Officers’ Course support, the crew a
HMS Artful, the third of the Royal Navy’s new Astute Class attack submarines will set sail for sea trials this summer. Artful, which will provide the Royal Navy with its most technologically advanced submarine, is currently preparing to leave the construction yard in Barrow-in-Furness for sea trials
BAE Systems San Diego Ship Repair received an $11 million modification to previously awarded contract for fiscal 2015 selected restricted availability (SRA) for USS Dewey (DDG 105). SRA includes the planning and execution of depot-level maintenance, alterations, and modifications that will update an