Exercise Rim of the Pacific (RIMPAC) presents participating nations with opportunities to work together on mutually beneficial defence projects. HMAS Success was the ideal platform to support Australia’s involvement in the practical component of a joint Australian, New Zealand, Canadian, United Stat
Aircraft carrier USS Theodore Roosevelt (CVN 71) welcomed aboard Carrier Air Wing One (CVW 1) for a luncheon and tour of the air wing’s ready rooms, July 1. CVW 1 and TR will work closely together over the coming year as they conduct increasingly complex integrated training to prepare for future d
The “Wolf Pack” of Helicopter Maritime Strike Squadron (HSM) 75 was presented the Naval Air Force Pacific 2013 Battle Efficiency award, or Battle “E”, June 19, at Naval Air Station North Island, Calif. “This squadron is remarkable,” said Commander, Naval Air Forces, Vice Adm. David H. Buss. “When
Lt. Wes Smith signals the launch of an EA-18G Growler assigned to the Cougars of Electronic Attack Squadron (VAQ) 139 on the flight deck of the aircraft carrier USS Carl Vinson (CVN 70). Carl Vinson is underway conducting unit level training off the coast of Southern California. The Boeing EA-18G
Northrop Grumman Corporation has received funding to produce pre-production units of the APR-39D(V)2 radar warning receiver (RWR)/electronic warfare management system (EWMS). Under terms of the joint services contract with the U.S. Army and U.S. Navy, Northrop Grumman will produce 18 APR-39D(V)2 u
The importance of expanded cooperation in the Gulf region was the theme of U.S. Defense Secretary Chuck Hagel’s remarks today at the Gulf Cooperation Council defense ministerial conference. Defense ministers from all six member nations, Bahrain, Kuwait, Oman, Qatar, Saudi Arabia and the United Ara
The Israeli Aerospace Industries (IAI) will showcase a dual-mode, manned/unmanned combat maritime vessel KATANA next week at the AUVSI Unmanned Systems exhibition in Florida, USA, according to the United Press International (UPI). Operation of the KATANA can be remotely controlled by using an adva
Command of USS Stout (DDG 55), an Arleigh Burke-class destroyer, officially changed hands during a ceremony May 2 at Naval Station Norfolk. Cmdr. Andrew Fitzpatrick assumed command from Cmdr. Bob Alpigini. Past and present crew members, friends, and family attended the time-honored change of comma
Exelis has received a contract valued at more than $91 million from the U.S. Navy to begin full rate production on Lot 11 of the ALQ-214 electronic self-protection system for F/A-18C/D Hornet and F/A-18E/F Super Hornet fighter aircraft. The Exelis ALQ-214(V)4/5 is a cutting-edge jamming subsystem
The Office of Naval Research (ONR) has awarded Raytheon Company an $8.5 million base contract to design the Flexible Distributed Array Radar (FlexDAR), enabling dynamic multi-mission radars capable of executing a variety of functions including surveillance, communications and electronic warfare. “
A new model for U.S.-China military-to-military relations was revelead yesterday in Beijing. The U.S. Defence Secretary Chuck Hagel’s visit, at the invitation of Chinese Defense Minister Gen. Chang Wanquan, to Beijing comes in the middle of a 10-day trip to the Asia-Pacific region, during which he
Raytheon Company has achieved another significant milestone for next generation Gallium Nitride (GaN) Radio Frequency (RF) semiconductor technology. Through the Defense Advanced Research Projects Agency (DARPA) Near Junction Thermal Transport effort under the Thermal Management Technologies progra
Science Applications International Corporation (SAIC) was awarded a task order by the Naval Surface Warfare Center, Crane Division (NSWC Crane) to provide engineering, technical, and program management support services to the Quality and Systems Engineering Assurance division. Under the task order
Raytheon Company voiced yesterday its readiness to continue work on the US Navy’s Next Generation Jammer (NGJ) contract. The U.S. Navy awarded Raytheon a $279.4 million contract in July 2013 to conduct the technology development phase of the program. In November 2013 the Government Accountability