
Spanish shipbuilder Navantia has contracted Damen Marine Components (DMC) for a series of rudders and steering gear systems that will be installed on board five Spanish Navy vessels. These next-generation vessels are of the F110 frigate class. DMC’s scope involves supplying Navantia with Twin Van de

Engie Axima Germany has been selected to provide a heating, ventilation and air conditioning system as well as the CBRN protection and the cooling systems for the German Navy’s F126 class frigates.

French defence contractor Naval Group and the Fleet Support Service have signed a contract for the operational maintenance of the French Navy’s nuclear attack submarines (SSN). The deal will be in force for over three years and is worth several hundred million euros, according to Naval Group. The ag

KBR won two recompetes totaling more than $120 million to provide engineering services for U.S. Navy training systems and aircraft survivability equipment.

Unmanned aerial vehicles (UAVs) and their sensors track and monitor wildlife, livestock, infrastructure, weather and construction progress, among other tasks.

The Royal Navy’s Type 45 destroyers will receive a £500 million upgrade to enhance their firepower capability, the UK Ministry of Defence (MOD) said.

The UK Ministry of Defence (MOD) has awarded a five-year contract to BAE Systems to provide a data management system to multiple ships in the Royal Navy fleet.

UV-based ballast water treatment specialist BIO-UV Group and its American engineering and servicing partner, The Columbia Group, have been selected to develop a ballast water treatment system for the United States Navy. The contract follows an international call for tenders to develop a military ver

European defence company MBDA has been awarded a contract to equip the Brazilian Navy’s new Tamandaré-class frigates with the Sea Ceptor air defence missile system.

Fairbanks Morse Engine (FME), a division of Fairbanks Morse Defense (FMD), has shipped two main propulsion diesel engines for the future USNS Earl Warren (T-AO 207), the US Navy’s new John Lewis-class fleet replenishment oiler.

Northrop Grumman Corporation has delivered the AN/SLQ-32(V)7 Surface Electronic Warfare Improvement Program (SEWIP) Block 3 Engineering and Development Model (EDM) to the U.S. Navy for land-based testing.

Finnish cranes and lifting equipment company Konecranes has received its second portal jib order from the US Navy, worth $43.5 million.

Northrop Grumman Corporation has been awarded a production contract option for 18 additional GQM-163A “Coyote” supersonic sea-skimming target vehicles.

The Royal Navy’s new Spearfish torpedo has been declared ready for front-line action with the navy and undergone extensive deepwater trials with HMS Audacious in the Bahamas. Five of the heavy torpedoes were successfully fired by Audacious – the fourth of the Royal Navy’s Astute-class nuclear-powere