Philippine Navy personnel helped fight a blaze onboard a cargo ship sailing off Misamis Oriental Thursday afternoon. Naval Forces Western Mindanao commander Rear Admiral Armado Guzman said Friday that the BRP-Emilio Liwag and BRP-Jose Loor Jr., skippered by Commander Rolando Guanzon and Lieutenant A
Shipyard’s sea trials of aircraft carrier INS Vikramaditya being retrofitted under Indian Navy’s order will start on May 25, 2012. On that day, the 45,000-ton carrier will take the sea for the first time, said Igor E. Leonov who is in charge of the carrier’s delivery. Shipbuilders of Sevmash will ha
The amphibious assault ship USS Makin Island (LHD 8), along with the embarked 11th Marine Expeditionary Unit (MEU), arrived in Singapore Dec. 21 for a port visit. During the visit, Sailors and Marines will have an opportunity to experience the Singapore culture and take part in a variety of Morale,
Project 667BDRM nuclear-powered ballistic missile submarine (SSBN) Verkhoturye which is currently being repaired on the main slipway of JSC Zvezdochka Ship Repair Center will be delivered to the Navy by the end of 2012, reports the yard’s press service. The submarine is supposed to leave the covered
Lockheed Martin Corp., Baltimore, Md., is being awarded a $15,239,268 contract to exercise an option for post-delivery support for LCS 3 (future USS Fort Worth). Lockheed Martin will perform the planning and implementation of deferred design changes that have been identified during the construction
Huntington Ingalls Industries today delivered the company’s sixth amphibious transport dock, San Diego (LPD 22), to the U.S. Navy. The ship was delivered in a brief ceremony at Ingalls Shipbuilding. “This delivery exemplifies the unique skill and craftsmanship of our shipbuilders,” said Doug Louns
JSC Rosoboronexport offers newest Russian submarine Amur-1650 for a tender issued by Indian government for procurement and license construction of six non-nuclear submarines. Russian analog of Project Amur-1650 is Project 677 Lada non-nuclear submarine. In 2010, lead sub of that project – SSK St. Pe
Raytheon Co., Integrated Defense Systems, has won a $254,000,000 contract for development, test, and delivery of DDG 1000 total ship computing environment software for the Self Defense Test Ship. Contract includes: post-delivery availability, post-shakedown availability, SPY-3 volume search software
Aircraft carrier USS Enterprise (CVN 65) wrapped up a two-week underway in the Atlantic Ocean Dec. 16, completing many qualifications needed for its upcoming deployment. During the underway period, Enterprise tested the crew in all areas including engineering, damage control, deck, navigation and fl
The Navy’s newest amphibious assault ship, USS Makin Island (LHD 8), played a major role in supporting theater security cooperation missions in the Asia-Pacific region by serving as the at-sea launching platform for U.S. Marine Corps forces participating in Exercise Kilat Eagle, Dec. 14. Kilat Eagle
The remote minehunting system (RMS), a critical component of the mine countermeasures mission package for the littoral combat ship class, completed the first phase of reliability testing Nov. 22, at the Lockheed Martin facilities off the coast of Palm Beach, Fla. The RMS, which will provide an off-b
The nuclear-powered aircraft carrier USS Enterprise (CVN 65) is showcasing her Sailors and missions as the ship supports the Navy’s Distinguished Visitor (DV) program. DV embarkations are intended to increase awareness of the Navy’s mission while highlighting the dedicated and professional service o
Detyens Shipyard, Inc., North Charleston, S.C., is being awarded a $7,908,907 firm-fixed-price contract for a 55-calendar day regular overhaul/dry-docking of Military Sealift Command fleet replenishment oiler USNS Big Horn. This shipyard availability is primarily for ship maintenance and repairs. Wo
General Manager Mr.Wu Chengye of China Shipping Industry Co., Ltd. and Vice Director Mr.Fu Xuyin of The Rescue and Salvage Bureau of China Communication & Transportation Ministry jointly started the plasma cutting machine, which marks that the construction of the rescue vessels 4-6# of The Rescue an