Propulsion

Shipbuilder shares video of Russian guided missile cruiser refit
Propulsion

Shipbuilder shares video of Russian guided missile cruiser refit

Russia’s Zvezdochka shipyard shared a video on YouTube showing a portion of works undertaken on the Russian Navy’s Sava-class guided missile cruiser Marshal Ustinov. The cruiser was recently delivered to the navy after spending five years in the port for repairs. This video does not show all repair

about 9 years ago
UK MOD contracts Amec Foster Wheeler for Naval Nuclear Propulsion Programme work
Propulsion

UK MOD contracts Amec Foster Wheeler for Naval Nuclear Propulsion Programme work

The UK Ministry of Defence has contracted Amec Foster Wheeler to support its Naval Nuclear Propulsion Programme (NNPP) with research and technology (R&T) services. The work is worth approximately £35m over five years and will sustain about 70 jobs at Amec Foster Wheeler’s offices and laboratories in

about 10 years ago
US Coast Guard OPCs to be powered by MAN 28/33D STC engines
Propulsion

US Coast Guard OPCs to be powered by MAN 28/33D STC engines

Eastern Shipbuilding, the shipbuilder in charge of constructing the U.S. Coast Guard’s new offshore patrol cutters, has picked MAN’s 28/33D STC engines as the main propulsion for the new vessels. The offshore patrol cutter (OPC) program is the replacement platform for the 13 Famous-class and 14 Reli

about 10 years ago
Second Thai Navy OPV to feature Servowatch platform management system
Propulsion

Second Thai Navy OPV to feature Servowatch platform management system

Thailand’s Bangkok Dock selected British Servowatch to deliver their integrated platform management system (IPMS) for the second River-class design patrol boat currently under construction for the Royal Thai Navy. The yet unnamed second Krabi-class offshore patrol vessel is being built in Thailand u

about 10 years ago
Indian Navy launches 4, commissions 3 ships in 2016
Propulsion

Indian Navy launches 4, commissions 3 ships in 2016

India’s push for indigenous shipbuilding resulted in the commissioning of three and launching of another four ships for the Indian Navy in 2016. INS Chennai, a P 15A Guided Missile Destroyer, was commissioned into the Navy by the Defence Minister Shri Manohar Parrikar at the Naval Dockyard, Mumbai o

about 10 years ago

Advertisement

USS Rafael Peralta passes acceptance trials
Propulsion

USS Rafael Peralta passes acceptance trials

The U.S. Navy’s future Arleigh Burke-class destroyer USS Rafael Peralta (DDG 115) completed acceptance trials December 16 after spending two days underway off the coast of Maine. USS Rafael Peralta is the third Flight IIA Restart destroyer laid down in October 2014 and christened a year later by the

about 10 years ago
Bechtel gets $303M for work on US Navy’s nuclear propulsion parts
Propulsion

Bechtel gets $303M for work on US Navy’s nuclear propulsion parts

The U.S. Naval Sea Systems Command has awarded Bechtel Plant Machinery a $303 million contract for naval nuclear propulsion components. Part of the engineering and construction giant Bechtel Corp, Bechtel Plant Machinery, Inc. (BPMI) is responsible for providing design and manufacturing of nuclear p

about 10 years ago
Russian guided-missile cruiser returns to fleet after five-year refit
Propulsion

Russian guided-missile cruiser returns to fleet after five-year refit

Russian Navy’s Sava-class guided missile cruiser Marshal Ustinov is ready for a return to the fleet after spending five years in the port for repairs, Russian shipbuilder Zvezdochka announced September 26. The Project 1164 cruiser left the shipyard December 24 after completing a series of at sea tri

about 10 years ago
French Navy’s final nuclear submarine starts 18-month overhaul
Propulsion

French Navy’s final nuclear submarine starts 18-month overhaul

Le Téméraire, the last of three French Navy’s nuclear submarines, has started her regular overhaul during which she will adapted to carry the M51 missile. Le Terrible, the fourth and latest in the series of new-generation of SSBNs has been equipped with the M51 missile from the outset. Le Téméraire

about 10 years ago
USS Zumwalt reaches San Diego homeport
Propulsion

USS Zumwalt reaches San Diego homeport

USS Zumwalt, the U.S. Navy’s next-generation destroyer, completed her maiden voyage reaching the new homeport of San Diego on December 8. Zumwalt departed Bath Iron Works shipyard Sept. 7 and made several port visits to eastern U.S. Navy fleet concentration areas, such as Norfolk and Mayport, Florid

about 10 years ago

Advertisement

GD gets $50M for design work on Flight III DDG 51 destroyers
Propulsion

GD gets $50M for design work on Flight III DDG 51 destroyers

The U.S. Navy has contracted General Dynamics Bath Iron Works for the continuation of Arleigh Burke-class (DDG 51) lead yard services and Flight III upgrade design efforts. This $59 million contract extends the services for engineering, technical support, special studies and Flight III design work f

about 10 years ago
US Navy co-hosts biofutures forum in Queensland, Australia
Propulsion

US Navy co-hosts biofutures forum in Queensland, Australia

The U.S. Navy and Queensland government started a two-day Biofutures Industry Forum at the Brisbane Convention and Exhibition Centre on December 7. The forum builds on a statement of cooperation signed between the two sides under which U.S. Navy’s Great Green Fleet warships would refuel with biofuel

about 10 years ago
USS Zumwalt continues homeport transit after repairs in Panama
Propulsion

USS Zumwalt continues homeport transit after repairs in Panama

USS Zumwalt, the lead ship of a new class of U.S. Navy’s advanced destroyers, has continued its transit to the San Diego naval base after undergoing repairs in Panama. After experiencing a breakdown while transiting the Panama Canal on November 21 the ship was first towed to the former U.S. naval ba

about 10 years ago
Boston Ship Repair to overhaul USNS Big Horn
Propulsion

Boston Ship Repair to overhaul USNS Big Horn

The U.S. Navy’s Military Sealift Command has awarded Boston Ship Repair a $9.9 million firm-fixed-price contract for a shipyard availability and regular overhaul and dry docking of the Henry J. Kaiser-class fleet replenishment oiler USNS Big Horn (T-AO 198). The 56-calendar day undertaking will incl

about 10 years ago