Worldwide communities have shown an increased awareness of the importance of providing an outlook for ending piracy. While reflecting on challenges and learning from failures, communities are taking part in the socio-technological dialogue in which good practice becomes the intellectual backbone for
The Rhode Island Marine Archaeology Project (RIMAP), a tenant activity at Naval Station Newport, is conducting underwater surveys of Newport Harbor in search of 13 British transport service vessels sunk in 1778 near historic Fort Adams that was blockaded by the Royal Navy during the War of 1812. “Mu
Rear Adm. Dave Johnson, Program Executive Officer for Submarines, authorized the release of the latest software build for the MK 54 Lightweight Torpedo, Jan. 13. Nine days later, and due to the teamwork exhibited by the Torpedo Enterprise, all MK54 torpedoes deployed in the 5th Fleet received the up
JSC Severnaya Verf shipyard (St. Petersburg) will construct 10 Project 20385 corvettes (modernized Project 20380 Stereguschiy) for Russian Navy, the yard’s press secretary Olga Vilde told RIA Novosti on Feb 1. Official keel-laying ceremony of Project 20385 lead corvette Gremyaschiy took place on sli
Odyssey Marine Exploration, Inc. , a pioneer in the field of deep-ocean shipwreck exploration and archaeology, has executed an agreement with the Maritime Heritage Foundation for the financing, archaeological survey and excavation, conservation and exhibit of HMS Victory (1744) and artifacts from th
780-th Navigational Hardware Repair Plant started to equip light-optical devices mounted on sea buoys, coastal beacons and lighthouses with special GLONASS-based modules. Mainly, this innovation is called to improve reliability of navigational aids and maintain safety of seafaring. The project will
Abraham Lincoln Carrier Strike Group (ALCSG) assets responded to a distressed Iranian fishing dhow in the Arabian Gulf, Jan. 31. At 12:37 p.m. local time, an MH-60S Seahawk helicopter, assigned to the Golden Falcons of Helicopter Sea Combat Squadron (HSC) 12 and embarked on aircraft carrier USS Abra
Huntington Ingalls Industries will present a new patrol frigate derivative of the company’s proven U.S. Coast Guard National Security Cutter at this week’s Pacific 2012 International Maritime and Naval Exposition. The patrol frigate could be built at the company’s Ingalls Shipbuilding facility in Mi
Arleigh Burke-class guided-missile destroyer USS James E. Williams (DDG 95) is participating in an integrated anti-submarine course (IAC) to certify Destroyer Squadron 2 (DESRON 2) during an ongoing composite unit training exercise (COMPTUEX) with the Enterprise Carrier Strike Group, Jan. 26. IAC is
Five “Tigertails” of Carrier Airborne Early Warning Squadron One Two Five (VAW-125), embarked aboard the Nimitz-class aircraft carrier USS Carl Vinson (CVN 70) as part of Carrier Air Wing Seventeen (CVW-17), flew an historic flight on Jan. 25 when they participated in the Navy’s first all-female E-2
INS Sudarshini a three masted barque (sail ship) and the second sail training ship of the Indian Navy was commissioned by Vice Admiral KN Sushil, Flag Officer Commanding in Chief Southern Naval Command at Naval Base, Kochi. INS Sudarshini is a follow on class of INS Tarangini which joined Southern N
In 2012, Russian Navy Hydrographic Service will receive a new Project 19920 large-size hydrographic boat. Two boats of that project are already in service at Caspian Flotilla and Pacific Fleet. The third vessel is planned to join Northern Fleet. Boat of that kind is designed for hydrographic and buo
Northrop Grumman Corporation is participating in the Pacific 2012 International Maritime Conference in Sydney, Australia, where it will highlight its maritime security capabilities and programmes, including marine navigation and ship control technology, and unmanned aircraft systems for maritime and
Two of the Royal Navy’s Trafalgar Class submarines are reaping the benefits of major upgrades to their combat systems following their latest maintenance periods. Failure by an individual project to deliver was not an option. To delay the upgrades until the next appropriate fit opportunity would deny