Shipbuilding

UK starts construction of first Type 26 frigate HMS Glasgow
Shipbuilding

UK starts construction of first Type 26 frigate HMS Glasgow

The name of the first Type 26 frigate to be built for the Royal Navy has been announced during a steel-cutting ceremony held at Govan shipyard in Scotland. Pressing the button which officially marked the ship’s construction start, UK Defence Secretary Michael Fallon announced that the first Type 26

about 9 years ago
DARPA contracts BAE Systems for submarine sonar enhancement
Shipbuilding

DARPA contracts BAE Systems for submarine sonar enhancement

The U.S. Defense Advanced Research Projects Agency (DARPA) has awarded BAE Systems a $4.6 million contract to work on enabling submarines to detect other submerged vessels at greater distances, while minimizing the risk of counter-detection. BAE will work under DARPA’s Mobile Offboard Clandestine Co

about 9 years ago
BAE Systems to develop UK’s first autonomous systems testing service
Shipbuilding

BAE Systems to develop UK’s first autonomous systems testing service

UK-based defense contractor BAE Systems announced it has been awarded £457,000 to design and deliver the UK’s first dedicated autonomous systems testing service. The grants were awarded by the Solent Local Enterprise Partnership (LEP), a locally-owned partnership between businesses and authorities.

about 9 years ago
BAE Systems picks 14 companies for Type 26 construction
Shipbuilding

BAE Systems picks 14 companies for Type 26 construction

BAE Systems has announced the selection of further 14 companies for work on the UK’s future Type 26 Global Combat Ship. According to BAE, the new contracts will support around 550 jobs and bring the total investment in the supply chain to more than £500m. The largest of the new contracts are for the

about 9 years ago
Multi-billion deal: Royal Navy orders three new Type 26 frigates
Shipbuilding

Multi-billion deal: Royal Navy orders three new Type 26 frigates

The first of the Royal Navy’s next-generation frigates will be laid down before the month is out after a £3.7 billion order was placed for three Type 26s. Defence Secretary Sir Michael Fallon yesterday announced the contract with BAE Systems to deliver the first batch of global combat ships. They wi

about 9 years ago

Advertisement

BAE Systems, Leonardo join forces for new precision-guided munitions
Shipbuilding

BAE Systems, Leonardo join forces for new precision-guided munitions

BAE Systems and Leonardo are teaming up for the development of new precision-guided munitions for advanced, large caliber weapon systems. The companies are expecting to offer new adaptations of Leonardo’s Vulcano — a family of gun-launched munitions that exceed the performance of currently available

about 9 years ago
US Coast Guard receives 24th fast response cutter Oliver Berry (WPC 1124)
Shipbuilding

US Coast Guard receives 24th fast response cutter Oliver Berry (WPC 1124)

The U.S. Coast Guard accepted its 24th fast response cutter, USCGC Oliver Berry (WPC 1124), in a ceremony at Coast Guard Sector Key West on Tuesday. Built by Bollinger Shipyards, the cutter is 154-feet long and has a crew complement of 24. It will be homeported in Honolulu. The Oliver Berry is tenta

about 9 years ago
Continental Maritime gets US Navy cruiser modernization contract
Shipbuilding

Continental Maritime gets US Navy cruiser modernization contract

The U.S. Navy has awarded Continental Maritime of San Diego a $37.7 million contract for maintenance work on the Ticonderoga-class guided missile cruiser USS Chosin (CG 65). Under the contract, Continental Maritime will perform a Special Selected Restricted Availability (SSRA) on the cruiser providi

about 9 years ago
Royal Navy minehunter starts sea trials after 18-month refit
Shipbuilding

Royal Navy minehunter starts sea trials after 18-month refit

Royal Navy’s Hunt-class mine counter measure vessel HMS Brocklesby has started her sea trials after spending 18 months in refit. According to shipbuilder BAE Systems, the trials started four months earlier than usual. Despite undergoing the largest work package for a Royal Navy mine countermeasure v

about 9 years ago
US Coast Guard orders additional six fast response cutters
Shipbuilding

US Coast Guard orders additional six fast response cutters

The U.S. Coast Guard has awarded Bollinger Shipyards a $289 million contract, exercising an option to acquire six more fast response cutters (FRCs). With this order, the number of FRCs delivered and on order so far was brought to 44. The main FRC contract, worth $1.5 billion if all options are exerc

about 9 years ago

Advertisement

BAE Systems gets $180m US Navy contract for laser-guided rocket production
Shipbuilding

BAE Systems gets $180m US Navy contract for laser-guided rocket production

BAE Systems has received a $180.5 million U.S. Navy contract to produce additional advanced precision kill weapon system (APKWSTM) laser-guided rockets to meet the growing U.S. and international demand for the systems. According to the company, APKWS rockets are seeing increasing use in theater beca

about 9 years ago
USS Wasp completes maintenance, ready for new homeport
Shipbuilding

USS Wasp completes maintenance, ready for new homeport

U.S. Navy’s amphibious assault ship USS Wasp (LHD 1) is nearly ready to head to her new homeport in Japan after works on her maintenance availability were completed in Norfolk. The Mid-Atlantic Regional Maintenance Center (MARMC) completed the Chief of Naval Operations (CNO) Planned Maintenance Avai

about 9 years ago
ASC, Austal team up for Future Frigate construction
Shipbuilding

ASC, Austal team up for Future Frigate construction

Australian shipbuilders Austal and ASC Shipbuilding announced they are teaming up for the construction of the Australian Navy’s SEA5000 Future Frigates. Under this arrangement, ASC Shipbuilding and Austal will act as one in support of the program, combining their skills and experience. “The Austal/A

about 9 years ago
Wood Group bags Royal Navy submarine insulation contract
Shipbuilding

Wood Group bags Royal Navy submarine insulation contract

Royal Navy’s Astute-class submarine builder BAE Systems has awarded Wood Group a two-year contract to provide insulation installation services on the Barrow-in-Furness-based submarines. Wood Group did not disclose the contract value but added that it includes up to three one-year extension options.

about 9 years ago