
General Atomics Electromagnetic Systems (GA-EMS) has announced that 10,000 catapult launches and arrested landings using the Electromagnetic Aircraft Launch System (EMALS) and Advanced Arresting Gear (AAG) have been successfully and safely completed aboard USS Gerald R. Ford (CVN 78).

Royal Navy’s Type 23 frigate HMS Kent has undergone an overhaul and is gearing up for its first deployment since accompanying the navy’s aircraft carrier HMS Queen Elizabeth and the carrier strike group to the Pacific Rim and back.

Belfast-based shipyard Harland & Wolff famous for building the Titanic has been awarded a contract to regenerate an ex-Royal Navy mine-hunting vessel, HMS Quorn.

French shipbuilding major Naval Group has started the construction of the second defence and intervention (FDI HN) frigate for the Hellenic Navy. The construction began with the steel-cutting ceremony which took place today, 13 July at the Naval Group’s shipyard in Lorient. The contract for three fr

The construction of the US Navy’s aircraft carrier John F. Kennedy has reached a significant milestone, American shipbuilding company Huntington Ingalls Industries revealed.

The commanding officer of USS Scranton (SSN 756), the US Navy’s Los Angeles-class fast-attack submarine, was relieved of command on 6 July.

The fourth phase of sea trials for the Indian Navy’s indigenous aircraft carrier (IAC) Vikrant has been successfully completed on 10 July.

Defence company Leonardo has signed an agreement to develop a naval operation center for coordinating operations at sea for the Qatari Emiri Navy.

Germany’s shipbuilder thyssenkrupp Marine Systems (TKMS) has handed over INS Oz, the second of four corvettes ordered by the Israeli Navy.

Italian shipbuilder Fincantieri has launched Musherib, the first-in-class offshore patrol vessel (OPV) ordered by the Qatari Ministry of Defence.
Mexican Navy’s POLA-class ARM Reformador, the Mexican equivalent of Damen’s SIGMA Frigate 10514, has completed sea trials, Dutch shipbuilding group Damen said. The program of sea trials included testing of platform and combat systems in addition to training of Mexican Navy crews. Damen said that the
The U.S. Navy awarded a Lockheed Martin-led team, which includes Fincantieri Marinette Marine (FMM), a multi-billion dollar (USD) order for the construction of four Multi-Mission Surface Combatants ships, as part of the country’s Foreign Military Sales program. Fincantieri will build the vessels at
Norfolk-based shipbuilder General Dynamics NASSCO has been awarded a USD 96.9 million contract for the execution of the USS Mason (DDG-87) fiscal year 2020 depot modernization period. The contract covers a combination of maintenance, modernization and repair of the Arleigh Burke-class guided-missile
Raytheon Company will build two additional shipsets of SPY-6 radars under a USD 250 million contract with the U.S. Navy, bringing its orderbook to a total of nine radar shipsets to DDG-51 Flight III destroyers. SPY-6 is a family of next generation, integrated air and missile defense radars that scal