USS Anzio’s CO Relieved of Duties The commanding officer of the guided-missile cruiser USS Anzio (CG 68) based at Naval Station Norfolk, Virginia, was relieved of his duties today by Commander, Carrier Strike Group 8, Rear Adm. Bret Batchelder. 50.000 Workers Could Build Australian Subs German shipb
Sailors aboard the amphibious transport dock ship USS New Orleans (LPD 18) earned their engineering operational certification (EOC) Aug. 20. Engineering Assessment Pacific (EAP) inspected the ship’s capability to conduct evolutions and combat casualties. Inspectors spent two days ensuring each engin
Huntington Ingalls Industries received a $12,5 million contract modification to previously awarded contract to provide long lead-time material procurement and planning yard services for CG-47-class cruisers and DD 963-class destroyers. The Company will provide necessary engineering, technical, plann
Lockheed Martin has received another contract to continue the modernization program of Aegis hardware and software onboard US Navy vessels. In the next phase of integrating the Aegis Combat System on the US Navy’s fleet, Lockheed Martin has won a ten-year contract that will, with options, have the p
Irving Shipbuilding celebrated the start of production of Canada’s First Arctic Offshore Patrol ship (AOPS) at its Halifax Shipyard. Delivery of the first HMCS Harry DeWolf-class ship is expected in 2018. Production has begun on two units for the centre section of the first Arctic Offshore Patrol sh
Huntington Ingalls Inc., Newport News, Virginia, is being awarded a $109,4 million modification to previously awarded submarine support contract. The deal includes engineering, technical, design, configuration management, integrated logistics support, database management, research and development, m
The U.S. Navy awarded a nearly $1.5 billion contract Aug. 27 to Boeing Defense, Space & Security for the procurement of 13 Full-Rate Production (FRP) Lot 2 P-8A Poseidon aircraft. Nine planes will join the U.S. fleet and four will join the Royal Australian Air Force (RAAF), who has been a cooperativ
Huntington Ingalls Industries’ Newport News Shipbuilding division announced that it has reintroduced steam to the aircraft carrier USS Abraham Lincoln (CVN 72) to begin final testing of the ship’s steam-powered systems. Moored at Outfitting Berth 1 at Newport News, Lincoln is in the final stages of
The Gold crew of the Ohio-class guided-missile submarine USS Michigan (SSGN 727) conducted a change of ceremony at Naval Base Kitsap-Bangor, Aug. 28. Capt. Gustavo Gutierrez, from Miami, Florida, relieved Capt. Benjamin Pearson III, from Gig Harbor, Washington, and assumed the duties and responsibil
General Dynamics Information Technology, Fairfax, Virginia, is being awarded an $8 million modification to previously awarded contract to exercise options for engineering and technical services to support hull, mechanical and electrical systems and equipment on U.S. naval ships. The contractor will
BAE Systems Norfolk Ship Repair received a $22,5 million contract for USS James E. Williams (DDG 95) fiscal 2016 dry-docking selected restricted availability (DSRA). This DSRA will include hull, machinery, electrical, electronics, ship alterations, and piping alteration and repair work. The primary
General Dynamics, Bath Iron Works, was awarded a $13 million modification to previously awarded contract to provide littoral combat ship (LCS) planning yard services. This option is for planning yard services for both LCS variants. Bath Iron Works will be the single planning yard providing engineeri
BAE Systems Norfolk Ship Repair is being awarded a $12,4 million contract for USS Oscar Austin (DDG 79) fiscal 2016 selected restricted availability. This selected restricted availability will include hull, machinery, electrical, electronics, ship alterations, and piping alteration and repair work.
Huntington Ingalls Industries received a $57,8 million contract to undertake planning efforts needed to conduct maintenance, upgrades and modernization works on USS Columbus (SSN 762) during the engineered overhaul period. This scope of work encompasses planning as well as maintenance and modernizat