BAE Systems San Diego Ship Repair, San Diego, Calif., is being awarded a $12,124,464 modification to previously awarded contract (N00024-10-C-4407) for the USS Green Bay (LPD 20) fiscal 2011 non dry-docking phased maintenance availability (PMA). PMAs provide for an extensive renovation and moderniza
ViaSat, Carlsbad, Calif., is being awarded a $14,127,671 cost-plus-fixed-fee delivery order for the development, qualification, and delivery of the Multifunctional Information Distribution System Joint Tactical Radio System Block Cycle One cryptographic modernization update. Work will be performed i
Siemens PLM Software, a business unit of the Siemens Industry Automation Division and a leading global provider of product lifecycle management (PLM) software and services, today announced that BAE Systems Submarine Solutions (BAE Systems), a world leading design and manufacturer of submarines, sig
Rear Adm. Rick Breckenridge, Commander Submarine Group Two welcomed the crew of the Los Angeles-class submarine USS Pasadena (SSN 752) who travelled more than 7,000 miles from Pearl Harbor, Hawaii to begin their extended maintenance overhaul at Portsmouth Naval Shipyard, Sept. 2. Breckenridge and th
The newest Arleigh Burke-class guided-missile destroyer, the future USS Spruance (DDG 111), sailed away from the Bath Iron Works shipyard in Bath, Maine Sept. 1 on its maiden voyage to her commissioning site in Key West, Fla. before heading to her eventual homeport of San Diego, Calif. This mileston
The Boeing Co., St. Louis, Mo., is being awarded a $16,881,855 modification to a previously awarded firm-fixed-price, fixed-price -incentive contract (N00019-09-C-0019) for non-recurring and recurring engineering in support of Engineering Change Proposal 6213R2, “Trailing Edge Flap Honeycomb Redesig
Lockheed Martin Corp., Missiles and Fire Control, Orlando, Fla., is being awarded a $49,950,000 firm-fixed-price contract for procurement of 18 AN/AAQ-30 target sight systems (TSS) that will be integrated into the AH-1Z Cobra attack helicopter. This integration is part of the USMC H-1 upgrade progra
Norfolk Naval Shipyard completed the installation of the main mast aboard USS Harry S. Truman (CVN 75) Aug. 20, marking the latest milestone in the ship’s 13-month dry docking planned incremental availability. The 112,000-pound mast – standing 10 feet taller and 23,000 pounds heavier than the mast r
BAE Systems San Diego Ship Repair, Inc., San Diego, Calif., is being awarded a $14,545,851 modification to a previously awarded cost-plus-award-fee contract (N00024-07-C-4407) to definitize the USS Preble (DDG 88) fiscal 2011 dry-dock selected restricted availability (DSRA). A DSRA includes the pla
Lockheed Martin recently delivered its third P-3 Orion with a new Mid-Life Upgrade (MLU) kit to U.S. Customs and Border Protection (CBP). This P-3 Orion joins two additional upgraded P-3s that CBP is currently operating to support its critical homeland security missions. Lockheed Martin delivered t
Raytheon Company delivered the 28th Ship Self-Defense System (SSDS MK 2) hardware ship set ahead of schedule. The ship sets will be installed on new ships and will also upgrade legacy combat management systems on in-service ships, bringing them up to U.S. Navy-certified open architecture (OA) standa
The Boeing Co., St. Louis, Mo., is being awarded a $135,000,000 cost-plus-incentive-fee, firm-fixed-price contract for the engineering, manufacturing, and development of the F/A-18E/F Infrared Search and Track System, a long-wave infrared detection system that targets airborne vehicles in a radar-de
President Benigno Aquino III is set to formally welcome on Tuesday the Philippine Navy’s newly acquired — and largest — ship. The Hamilton cutter ship arrived at the Manila Bay on Sunday morning after sailing for more than a month from San Francisco in the United States. It will be named BRP Gregori
BAE Systems, Land & Armaments, L.P., U.S. Combat Systems, is being awarded an undefinitized contract action with a not-to-exceed value of $83,277,606 as a modification to previously awarded contract (N00024-10-C-5349) for the fiscal 2010-2011 production requirements for MK 13 MOD 0 (Standard Missile