The Boeing Co., Jacksonville, Fla., is being awarded a $31,503,536 firm-fixed-price, cost-plus-fee requirements contract for supplies and services for in-warranty and out-of-warranty depot-level modification installations and in-service repairs incident to modification kit installs including associa
American destroyer USS Fitzgerald arrives at Russia’s Pacific Fleet main naval base Vladivostok on Saturday, Oct 1. This will be the second call of US Navy ship to the capital city of Primorsky Krai in the current year. The crew of frigate USS Ford visited Vladivostok early in July 2011. Main purpos
The Government has agreed to the purchase from Navantia of 12 medium-sized fast landing craft (the LCM-1E) for the Landing Helicopter Dock (LHD) through Joint Project 2048 Phase 3. This follows a decision in February 2009 to direct source the purchase of the watercraft to Navantia. Navantia are buil
USS Constitution Sailors gave Navy ballcaps to children during a Caps for Kids visit at Baystate Medical Center in Springfield, Mass. Sept. 27. Interior Communications Electrician 1st Class (SW) John Campbell, Aviation Electrician’s Mate 2nd Class (AW) Anthony Barnardo and Seaman Deidre Foster parti
Delegation of Baltic Fleet (BF) marines is invited to visit 1st Amphibious Regiment (Berga, near Stockholm) in Sept 27-30 within the framework of international military cooperation between Russian and Swedish defense ministries. During the visit, Russian officers will familiarize with day-to-day act
The U.S. Navy’s Electromagnetic Aircraft Launch System, EMALS, test team launched an E-2D Advanced Hawkeye Sept. 27, at the full-size shipboard-representative test site here. “These successful E-2D launches continue to reaffirm my confidence in the EMALS program,” said Capt. James Donnelly, Aircraft
BAE Systems Norfolk Ship Repair, Norfolk, Va., is being awarded a $51,269,726 modification to a previously awarded contract (N00024-10-C-4308) for USS Barry (DDG 52) fiscal 2011 extended drydocking selected restricted availability (EDSRA). An EDSRA includes the planning and execution of depot-level
The Netherlands is to extend its participation in NATO’s Operation Unified Protector by 3 months. This was announced by the Minister of Foreign Affairs, Uri Rosenthal, and the Minster of Defence, Hans Hillen, on Wednesday 21 September. The Dutch contribution will continue to consist of a Dutch mineh
Northern Fleet (NF) Commander Vice Admiral Vladimir Korolev met with deputy chief of Norwegian main operational command Maj. Gen. Morten Lunde during the visit of Norwegian military delegation to Russia’s Northern Fleet, told NF Information Support Group to Central Navy Portal. The parties held a pr
Military Sealift Command accepted delivery of dry cargo/ammunition ship USNS William McLean (T-AKE 12) during a ceremony at the General Dynamics NASSCO shipyard in San Diego Sept. 28. The 689-foot long McLean, designated T-AKE 12, is the 12th of 14 new dry cargo/ammunition ships scheduled for delive
The U.S. aircraft carrier USS George Washington will make a port call in South Korea this week for a regular visit, the U.S. military… By Kim Deok-hyun (yonhapnews) [mappress] Source: yonhapnews, September 28, 2011
BAE Systems Norfolk Ship Repair, Norfolk, Va., is being awarded an $18,096,417 modification previously awarded contract (N00024-10-C-4308) for USS Bulkeley (DDG-84) fiscal 2012 drydocking selected restricted availability. The effort to be performed includes planning and execution of depot-level main
On Tuesday, September 27th the third Oceangoing Patrol Vessel (OPV), FRIESLAND, left the Damen Shipyard from Galati, Romania for her Sea Acceptance Trials. After a journey of 150 kilometres along the Danube, the ship has arrived at the Black Sea where it will be conducting tests for the next 10 days
BAE Systems Norfolk Ship Repair, Norfolk, Va., is being awarded a $50,613,287 modification to previously awarded contract (N00024-10-C-4308) for USS Stout (DDG 55) fiscal 2011 Extended Drydocking Selected Restricted Availability (EDSRA). An EDSRA includes the planning and execution of depot-level ma