Naval Today
  • Vessels
  • Equipment & Technology
  • Operations
  • Capital Investments
  • Authorities
  • More news
JobsNewsletter
Naval Today logo

Your trusted source for naval and maritime news, part of the Navingo network.

Topics
  • Equipment & technology
  • Industry
  • Vessels
  • Operations
  • Training & Education
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Shipbuilding

Loading filters...
ContractsCapital InvestmentsVesselsAuthoritiesAmphibious & Support ShipsDefense StrategiesContracts & TendersSurface VesselsFundingBusiness & FinanceEquipment & technologyWeapons SystemsLaws and RegulationsOperationsTraining & Education
BAE Systems lands USS Anchorage modification contract
Shipbuilding

BAE Systems lands USS Anchorage modification contract

U.S. Navy’s Southwest Regional Maintenance Center, San Diego, California awarded BAE Systems San Diego Ship Repair a $25,589,923 modification to a previously awarded contract for the 2016 selected restricted availability (SRA) of USS Anchorage (LPD-23). An SRA includes the planning and execution of

about 10 years ago
Brazilian Navy ship makes port call in Cape Town, Africa
Shipbuilding

Brazilian Navy ship makes port call in Cape Town, Africa

Brazilian Navy’s BNS Amazonas came alongside in Cape Town, South Africa at the V&A Waterfront for a port call on January 8. BNS Amazonas, a 90-meter offshore patrol vessel, left Brazil late December 2015. The ship forms part of the south east naval grouping of the Brazilian Navy which is used in per

about 10 years ago
US Coast Guard receives 16th fast response cutter
Shipbuilding

US Coast Guard receives 16th fast response cutter

The United States Coast Guard accepted delivery of the 16th fast response cutter, the Coast Guard Cutter Winslow Griesser, in Key West, Florida, December 23. The cutter’s commissioning is scheduled for March 2016 in San Juan, Puerto Rico, where the ship will be stationed. The 154-foot patrol craft W

about 10 years ago
BAE Systems, SAIC to Build US Marine ACVs
Shipbuilding

BAE Systems, SAIC to Build US Marine ACVs

The U.S. Marine Corps Systems Command awarded a total of $225.3M for the development and production of a new Amphibious Combat Vehicle (ACV). SAIC, the American-based government contractor, received a $121.5M contract and BAE Systems recieved $103.7M for the build of initial 13 prototypes. The two c

about 10 years ago
BAE Systems To Upgrade USS Forrest Sherman
Shipbuilding

BAE Systems To Upgrade USS Forrest Sherman

BAE Systems Norfolk Ship Repair received a USD 25,2 million contract for modernization works aboard the US Navy’s Arleigh Burke-class destroyer USS Forrest Sherman (DDG 98). Work, to be undertaken in Norfolk, Virginia, is expected to be completed by July 2016. The contract includes ship repair, main

about 10 years ago
BAE Systems to Reduce Workforce in Australia
Shipbuilding

BAE Systems to Reduce Workforce in Australia

BAE Systems, a British multinational defence, security and aerospace company, in an update on its business announced a “further headcount reductions” at its Australian shipyard. Despite Australia’s intention to launch a naval shipbuilding strategy, BAE Systems said that “it is unclear whether this i

about 10 years ago
USCG Receives 15th Fast Response Cutter
Shipbuilding

USCG Receives 15th Fast Response Cutter

Bollinger Shipyards has delivered the Joseph Napier, the 15th Fast Response Cutter (FRC) to the United States Coast Guard. The 154 foot patrol craft Joseph Napier is the 15th vessel in the Coast Guard’s Sentinel-class FRC program. To build the FRC, Bollinger used a craft design based on the Damen St

about 10 years ago
First Steel Cut for Royal Navy’s Third Patrol Vessel
Shipbuilding

First Steel Cut for Royal Navy’s Third Patrol Vessel

Construction of the final Royal Navy Offshore Patrol Vessel (OPV) took an important step forward today, as the Minister of State for Defence Procurement started a computer-guided laser to cut the first piece of hull. During a visit to BAE Systems’ Govan yard in Glasgow, Defence Minister Philip Dunne

about 10 years ago
USS Cape St. George Repair Deal Awarded
Shipbuilding

USS Cape St. George Repair Deal Awarded

US Navy awarded further fiscal 2015 extended dry-docking selected restricted availability works for its Ticonderoga-class cruiser USS Cape St. George (CG-71). The $50,6 million deal is a modification of the previously awarded contract to BAE Systems San Diego Ship Repair, San Diego, California. An e

about 10 years ago
BAE Systems Wins USS Milius Maintenance Works
Shipbuilding

BAE Systems Wins USS Milius Maintenance Works

BAE Systems San Diego Ship Repair received a $53,6 million modification to previously awarded contract for USS Milius (DDG 69) fiscal 2015 extended selected restricted availability. An extended selected restricted availability includes the planning and execution of depot-level maintenance, alteratio

about 10 years ago
BAE Systems Wins Further USS Halsey Repair Works
Shipbuilding

BAE Systems Wins Further USS Halsey Repair Works

BAE Systems Hawaii is being awarded a $39,1 million modification to previously awarded contract for scheduled drydocking selected restricted availability (DSRA) of USS Halsey (DDG 97). The scheduled DSRA is the opportunity in the ship’s life cycle primarily to conduct repair and alteration to system

about 10 years ago
Most Read News, September 14 – 20, 2015
Shipbuilding

Most Read News, September 14 – 20, 2015

US Navy to Cancel Third Zumwalt? Pentagon is considering the cancellation of the third next-generation stealth destroyer USS Lyndon B. Johnson. Video: Royal Navy’s Type 26 Designs Revealed New images and video of what the British Navy’s Type 26 “Global Combat Ship” will look like have gone on show a

about 11 years ago
USS New Orleans Sailors Complete EOC
Shipbuilding

USS New Orleans Sailors Complete EOC

Sailors aboard the amphibious transport dock ship USS New Orleans (LPD 18) earned their engineering operational certification (EOC) Aug. 20. Engineering Assessment Pacific (EAP) inspected the ship’s capability to conduct evolutions and combat casualties. Inspectors spent two days ensuring each engin

about 11 years ago
BAE Systems Wins USS James E. Williams Repair Deal
Shipbuilding

BAE Systems Wins USS James E. Williams Repair Deal

BAE Systems Norfolk Ship Repair received a $22,5 million contract for USS James E. Williams (DDG 95) fiscal 2016 dry-docking selected restricted availability (DSRA). This DSRA will include hull, machinery, electrical, electronics, ship alterations, and piping alteration and repair work. The primary

about 11 years ago
  • 1
  • …
  • 10
  • 11
  • 12
  • …
  • 27